Fire-Tube Condensing 5-Ton Steam Boiler

Product family: High-Efficiency Industrial Boilers.

Flow: Seamless tube supplier → Shell Roll & Furnace Corrugate → TIG Tube-Sheet Expand & Seal → 100% Weld Radiographic NDT → Ceramic Blanket Cladding Fit → ASME Hydro & Burner Firing → Food, Textile & Pharma Plants

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Fire-Tube Condensing 5-Ton Steam BoilerSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Seamless tube supplier → Shell Roll & Furnace Corrugate (2,295 s) → TIG Tube-Sheet Expand & Seal (2,903 s) → 100% Weld Radiographic NDT (3,645 s) → Ceramic Blanket Cladding Fit (2,633 s) → ASME Hydro & Burner Firing (2,025 s) → Food, Textile & Pharma Plants.SUPPLIERSeamless tubesupplierI1.75 d1Shell Roll &Furnace CorrugateC/T 2,295 sI1.75 d2TIG Tube-SheetExpand & SealC/T 2,903 sI2.25 d3100% WeldRadiographic NDTC/T 3,645 sI1.13 d4Ceramic BlanketCladding FitC/T 2,633 sI0.75 d5ASME Hydro &Burner FiringC/T 2,025 sI1.50 dCUSTOMERFood, Textile &Pharma Plants8 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Shell Roll & Furnace Corrugate2,295 s35 min93%98.7%1214 (1.75 d)10
2. TIG Tube-Sheet Expand & Seal2,903 s30 min90%96.9%614 (1.75 d)7
3. 100% Weld Radiographic NDT3,645 s45 min84%95.5%818 (2.25 d)5
4. Ceramic Blanket Cladding Fit2,633 s15 min94%98.3%39 (1.13 d)9
5. ASME Hydro & Burner Firing2,025 s8 min96%99.1%26 (0.75 d)12

Key figures

Takt time
3,375 s
Lead time
9.63 d
Value-added time
13,501 s
Process cycle efficiency (PCE)
5.2%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
8 units
Line capacity per day
5 units
Bottleneck
100% Weld Radiographic NDT

Reading the bottleneck

The bottleneck is "100% Weld Radiographic NDT": it can process 5 units per day against a demand of 8 units, so it falls short of demand by 33.2%. Once downtime and scrap are counted, its cycle time grows from 3,645 s to 4,544 s, against a takt of 3,375 s. The largest loss at this step is equipment downtime (uptime 84%), about 694 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.