Pultruded FRP Crossflow Industrial Cooling Tower
Product family: Modular Evaporative Cells.
Flow: FRP profile supplier → FRP Pultrusion Mitre & Drill → Basin Seal & Drift Eliminator → Axial FRP Fan & Gear Drive → PVC Film-Fill Block Stack → Vibration & Air-Flow Cert → Industrial & HVAC Plants
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. FRP Pultrusion Mitre & Drill | 1,311 s | 35 min | 93% | 98.7% | 21 | 24 (1.71 d) | 18 |
| 2. Basin Seal & Drift Eliminator | 1,659 s | 30 min | 90% | 96.9% | 11 | 25 (1.79 d) | 13 |
| 3. Axial FRP Fan & Gear Drive | 2,083 s | 45 min | 84% | 95.5% | 14 | 31 (2.21 d) | 9 |
| 4. PVC Film-Fill Block Stack | 1,504 s | 15 min | 94% | 98.3% | 6 | 15 (1.07 d) | 15 |
| 5. Vibration & Air-Flow Cert | 1,157 s | 8 min | 96% | 99.1% | 3 | 11 (0.79 d) | 20 |
Key figures
- Takt time
- 1,929 s
- Lead time
- 9.36 d
- Value-added time
- 7,714 s
- Process cycle efficiency (PCE)
- 3.1%
- Rolled throughput yield (RTY)
- 89.0%
- Customer demand per day
- 14 units
- Line capacity per day
- 9 units
- Bottleneck
- Axial FRP Fan & Gear Drive
Reading the bottleneck
The bottleneck is "Axial FRP Fan & Gear Drive": it can process 9 units per day against a demand of 14 units, so it falls short of demand by 33.2%. Once downtime and scrap are counted, its cycle time grows from 2,083 s to 2,597 s, against a takt of 1,929 s. The largest loss at this step is equipment downtime (uptime 84%), about 397 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Electric Motors, HVAC & Heat Transfer: Electric Motors, HVAC & Heat Transfer
- Compact Brushless Industrial Servo Motor
- 800kW Magnetic-Bearing Centrifugal Chiller
- Laser-Welded 316L Plate Heat Exchanger
- ATEX Zone-1 Explosion-Proof 250kW Motor
- Fire-Tube Condensing 5-Ton Steam Boiler
- Commercial Heat-Recovery VRF Outdoor Unit
- Alu-Silica Desiccant Enthalpy Rotary Wheel
- Copper Foil Winding 2MVA Transformer Coil
- Microchannel V-Bank Adiabatic Air Condenser
- Pre-Fabricated District Heating Substation Skid
- Forged Stainless Steel Micro-Hydro Pelton Wheel