Commercial Heat-Recovery VRF Outdoor Unit
Product family: Inverter Twin-Rotary VRF Systems.
Flow: R32 Compressors & Cu Coils → Copper Fin-Coil Bending & Braze → Twin-Inverter Compressor Mount → Automated Vacuum & R32 Charge → Halogen Sniffer Leak Tunnel → 3-Mode Heat/Cool Chamber → Commercial Tower Contractors
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Copper Fin-Coil Bending & Braze | 193 s | 35 min | 93% | 98.7% | 285 | 323 (1.70 d) | 250 |
| 2. Twin-Inverter Compressor Mount | 244 s | 30 min | 90% | 96.9% | 152 | 342 (1.80 d) | 185 |
| 3. Automated Vacuum & R32 Charge | 307 s | 45 min | 84% | 95.5% | 190 | 418 (2.20 d) | 134 |
| 4. Halogen Sniffer Leak Tunnel | 222 s | 15 min | 94% | 98.3% | 76 | 209 (1.10 d) | 215 |
| 5. 3-Mode Heat/Cool Chamber | 171 s | 8 min | 96% | 99.1% | 38 | 152 (0.80 d) | 287 |
Key figures
- Takt time
- 284 s
- Lead time
- 9.12 d
- Value-added time
- 1,137 s
- Process cycle efficiency (PCE)
- 0.23%
- Rolled throughput yield (RTY)
- 89.0%
- Customer demand per day
- 190 units
- Line capacity per day
- 134 units
- Bottleneck
- Automated Vacuum & R32 Charge
Reading the bottleneck
The bottleneck is "Automated Vacuum & R32 Charge": it can process 134 units per day against a demand of 190 units, so it falls short of demand by 29.4%. Once downtime and scrap are counted, its cycle time grows from 307 s to 383 s, against a takt of 284 s. The largest loss at this step is equipment downtime (uptime 84%), about 58.5 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Electric Motors, HVAC & Heat Transfer: Electric Motors, HVAC & Heat Transfer
- Compact Brushless Industrial Servo Motor
- 800kW Magnetic-Bearing Centrifugal Chiller
- Laser-Welded 316L Plate Heat Exchanger
- Pultruded FRP Crossflow Industrial Cooling Tower
- ATEX Zone-1 Explosion-Proof 250kW Motor
- Fire-Tube Condensing 5-Ton Steam Boiler
- Alu-Silica Desiccant Enthalpy Rotary Wheel
- Copper Foil Winding 2MVA Transformer Coil
- Microchannel V-Bank Adiabatic Air Condenser
- Pre-Fabricated District Heating Substation Skid
- Forged Stainless Steel Micro-Hydro Pelton Wheel