Hydraulics, Pumps & Valves VSM Scenarios

12 scenarios of Hydraulics, Pumps & Valves, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.

Shared steps

All 12 scenarios follow the same flow, from supplier to customer: Bar Cut & Induction Pre-Turn → Multi-Axis Port & Bore CNC → Hard Chrome & Precision Hone → Cleanroom Spool & Seal Match → 350-Bar Hydro Pressure Bench. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.

Scenario comparison

Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.

ScenarioDemandShiftsTaktLead timePCEBottleneck
Swashplate Axial Piston Hydraulic Pump 280cc160 units per day2338 s8.72 d0.28%Hard Chrome Piston Grind
Double-Acting Telescopic Chrome Cylinder220 units per day2245 s8.72 d0.21%Friction-Weld Eye & Port Weld
Proportional Electro-Hydraulic Valve Bank290 units per day2186 s8.71 d0.16%Diamond Hone Spool Bore
SAE 100R15 Spiral Hydraulic Hose Assembly1,400 units per day238.6 s8.70 d0.033%Laser Marker Crimp Depth Set
Oil-Injected Rotary Screw Air-End 90kW45 units per day21,200 s8.80 d1.0%Housing Tri-Lobe Bore CNC
High-Chrome Abrasive Mining Slurry Pump24 units per day11,125 s8.87 d1.9%Natural Rubber Liner Mold
Right-Angle Helical-Bevel Conveyor Drive190 units per day2284 s8.72 d0.24%Gear Tooth Grind
Multistage Stainless Deep-Well Submersible130 units per day2415 s8.73 d0.35%Water-Lubed Ceramic Bearing
6MW Offshore Wind Planetary Multiplier4 units per day213,500 s9.74 d10.2%Planetary Carrier Bore Align
ISO 15552 Anodized Pneumatic Cylinder Cell2,200 units per day224.5 s8.70 d0.021%Magnetic Ring & Seal Press
API-600 Forged Carbon Steel Steam Globe Valve85 units per day2635 s8.75 d0.53%Precision Lap Plug & Seat
Dry Claw Industrial Vacuum Pump Cell60 units per day2900 s8.77 d0.75%PTFE Anti-Corrosion Coat