Proportional Electro-Hydraulic Valve Bank

Product family: 6-Spool Load-Sensing Banks.

Flow: Cast Iron & Forged Steel → 5-Axis Deep Port Cross-Drill → EDM Proportional Groove Cut → Diamond Hone Spool Bore → Clean Bench CAN Coil Fit → Oil Hysteresis & Flow Map → Crane & Forestry Builders

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Proportional Electro-Hydraulic Valve BankSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Cast Iron & Forged Steel → 5-Axis Deep Port Cross-Drill (123 s) → EDM Proportional Groove Cut (156 s) → Diamond Hone Spool Bore (199 s) → Clean Bench CAN Coil Fit (145 s) → Oil Hysteresis & Flow Map (115 s) → Crane & Forestry Builders.SUPPLIERCast Iron &Forged SteelI1.60 d15-Axis Deep PortCross-DrillC/T 123 sI1.70 d2EDM ProportionalGroove CutC/T 156 sI2.20 d3Diamond HoneSpool BoreC/T 199 sI1.00 d4Clean Bench CANCoil FitC/T 145 sI0.70 d5Oil Hysteresis &Flow MapC/T 115 sI1.50 dCUSTOMERCrane &Forestry…290 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 5-Axis Deep Port Cross-Drill123 s25 min95%98.8%290464 (1.60 d)401
2. EDM Proportional Groove Cut156 s38 min91%97.6%232493 (1.70 d)291
3. Diamond Hone Spool Bore199 s45 min84%95.0%290638 (2.20 d)206
4. Clean Bench CAN Coil Fit145 s15 min94%98.2%116290 (1.00 d)329
5. Oil Hysteresis & Flow Map115 s10 min96%99.1%58203 (0.70 d)422

Key figures

Takt time
186 s
Lead time
8.71 d
Value-added time
738 s
Process cycle efficiency (PCE)
0.16%
Rolled throughput yield (RTY)
89.1%
Customer demand per day
290 units
Line capacity per day
206 units
Bottleneck
Diamond Hone Spool Bore

Reading the bottleneck

The bottleneck is "Diamond Hone Spool Bore": it can process 206 units per day against a demand of 290 units, so it falls short of demand by 29.1%. Once downtime and scrap are counted, its cycle time grows from 199 s to 249 s, against a takt of 186 s. The largest loss at this step is equipment downtime (uptime 84%), about 37.9 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Hydraulics, Pumps & Valves: Hydraulics, Pumps & Valves