Double-Acting Telescopic Chrome Cylinder

Product family: Heavy Excavator Lift Rams.

Flow: Seamless honed tube supplier → Tube Cut & Skive-Roller Burn → Induction-Hard Chrome Shaft → Friction-Weld Eye & Port Weld → Seal Gland Torque Assemble → 300-Bar Drift & Cushion Test → Earthmoving OEMs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Double-Acting Telescopic Chrome CylinderSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Seamless honed tube supplier → Tube Cut & Skive-Roller Burn (162 s) → Induction-Hard Chrome Shaft (206 s) → Friction-Weld Eye & Port Weld (263 s) → Seal Gland Torque Assemble (191 s) → 300-Bar Drift & Cushion Test (152 s) → Earthmoving OEMs.SUPPLIERSeamless honedtube supplierI1.60 d1Tube Cut &Skive-Roller BurnC/T 162 sI1.70 d2Induction-HardChrome ShaftC/T 206 sI2.20 d3Friction-Weld Eye& Port WeldC/T 263 sI1.00 d4Seal Gland TorqueAssembleC/T 191 sI0.70 d5300-Bar Drift &Cushion TestC/T 152 sI1.50 dCUSTOMEREarthmovingOEMs220 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Tube Cut & Skive-Roller Burn162 s25 min95%98.8%220352 (1.60 d)304
2. Induction-Hard Chrome Shaft206 s38 min91%97.6%176374 (1.70 d)221
3. Friction-Weld Eye & Port Weld263 s45 min84%95.0%220484 (2.20 d)156
4. Seal Gland Torque Assemble191 s15 min94%98.2%88220 (1.00 d)250
5. 300-Bar Drift & Cushion Test152 s10 min96%99.1%44154 (0.70 d)319

Key figures

Takt time
245 s
Lead time
8.72 d
Value-added time
974 s
Process cycle efficiency (PCE)
0.21%
Rolled throughput yield (RTY)
89.1%
Customer demand per day
220 units
Line capacity per day
156 units
Bottleneck
Friction-Weld Eye & Port Weld

Reading the bottleneck

The bottleneck is "Friction-Weld Eye & Port Weld": it can process 156 units per day against a demand of 220 units, so it falls short of demand by 29.2%. Once downtime and scrap are counted, its cycle time grows from 263 s to 330 s, against a takt of 245 s. The largest loss at this step is equipment downtime (uptime 84%), about 50.1 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.