High-Chrome Abrasive Mining Slurry Pump

Product family: Nickel-Chrome White Iron Pumps.

Flow: Wear-resistant iron foundry → Foundry Degate & Heat Soak → CBN Rough & Finish Bore → Natural Rubber Liner Mold → Shaft Cartridge Bearing Fit → NPSH Water Curve Certification → Copper & Gold Mine Mills

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: High-Chrome Abrasive Mining Slurry PumpSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Wear-resistant iron foundry → Foundry Degate & Heat Soak (743 s) → CBN Rough & Finish Bore (945 s) → Natural Rubber Liner Mold (1,204 s) → Shaft Cartridge Bearing Fit (878 s) → NPSH Water Curve Certification (698 s) → Copper & Gold Mine Mills.SUPPLIERWear-resistantiron foundryI1.58 d1Foundry Degate &Heat SoakC/T 743 sI1.71 d2CBN Rough &Finish BoreC/T 945 sI2.21 d3Natural RubberLiner MoldC/T 1,204 sI1.00 d4Shaft CartridgeBearing FitC/T 878 sI0.71 d5NPSH Water CurveCertificationC/T 698 sI1.50 dCUSTOMERCopper & GoldMine Mills24 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Foundry Degate & Heat Soak743 s25 min95%98.8%2438 (1.58 d)32
2. CBN Rough & Finish Bore945 s38 min91%97.6%1941 (1.71 d)23
3. Natural Rubber Liner Mold1,204 s45 min84%95.0%2453 (2.21 d)16
4. Shaft Cartridge Bearing Fit878 s15 min94%98.2%1024 (1.00 d)26
5. NPSH Water Curve Certification698 s10 min96%99.1%517 (0.71 d)33

Key figures

Takt time
1,125 s
Lead time
8.87 d
Value-added time
4,468 s
Process cycle efficiency (PCE)
1.9%
Rolled throughput yield (RTY)
89.1%
Customer demand per day
24 units
Line capacity per day
16 units
Bottleneck
Natural Rubber Liner Mold

Reading the bottleneck

The bottleneck is "Natural Rubber Liner Mold": it can process 16 units per day against a demand of 24 units, so it falls short of demand by 32.9%. Once downtime and scrap are counted, its cycle time grows from 1,204 s to 1,509 s, against a takt of 1,125 s. The largest loss at this step is equipment downtime (uptime 84%), about 229 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.