Swashplate Axial Piston Hydraulic Pump 280cc

Product family: Closed-Loop Hydrostatic Pumps.

Flow: GGG50 Iron Foundries → Housing Horizontal CNC → Bronze Cylinder Block Lap → Hard Chrome Piston Grind → Cleanroom Valve-Plate Match → 420-Bar Volumetric Flow Dyno → Construction & Ag OEMs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Swashplate Axial Piston Hydraulic Pump 280ccSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. GGG50 Iron Foundries → Housing Horizontal CNC (223 s) → Bronze Cylinder Block Lap (284 s) → Hard Chrome Piston Grind (361 s) → Cleanroom Valve-Plate Match (263 s) → 420-Bar Volumetric Flow Dyno (209 s) → Construction & Ag OEMs.SUPPLIERGGG50 IronFoundriesI1.60 d1HousingHorizontal CNCC/T 223 sI1.70 d2Bronze CylinderBlock LapC/T 284 sI2.20 d3Hard ChromePiston GrindC/T 361 sI1.00 d4CleanroomValve-Plate MatchC/T 263 sI0.70 d5420-BarVolumetric Flow…C/T 209 sI1.50 dCUSTOMERConstruction &Ag OEMs160 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Housing Horizontal CNC223 s25 min95%98.8%160256 (1.60 d)221
2. Bronze Cylinder Block Lap284 s38 min91%97.6%128272 (1.70 d)160
3. Hard Chrome Piston Grind361 s45 min84%95.0%160352 (2.20 d)113
4. Cleanroom Valve-Plate Match263 s15 min94%98.2%64160 (1.00 d)182
5. 420-Bar Volumetric Flow Dyno209 s10 min96%99.1%32112 (0.70 d)232

Key figures

Takt time
338 s
Lead time
8.72 d
Value-added time
1,340 s
Process cycle efficiency (PCE)
0.28%
Rolled throughput yield (RTY)
89.1%
Customer demand per day
160 units
Line capacity per day
113 units
Bottleneck
Hard Chrome Piston Grind

Reading the bottleneck

The bottleneck is "Hard Chrome Piston Grind": it can process 113 units per day against a demand of 160 units, so it falls short of demand by 29.1%. Once downtime and scrap are counted, its cycle time grows from 361 s to 452 s, against a takt of 338 s. The largest loss at this step is equipment downtime (uptime 84%), about 68.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.