SAE 100R15 Spiral Hydraulic Hose Assembly
Product family: 420-Bar Multi-Spiral Hoses.
Flow: Hose & coupling supplier → Orbital Cut & Internal Skive → Ultrasonic Foam Clean Blast → Laser Marker Crimp Depth Set → 840-Bar Impulse Burst Audit → Barcoded Cap & Kit Bagging → OEM Hose Kitting Lines
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Orbital Cut & Internal Skive | 25.5 s | 25 min | 95% | 98.8% | 1,400 | 2,240 (1.60 d) | 1,932 |
| 2. Ultrasonic Foam Clean Blast | 32.4 s | 38 min | 91% | 97.6% | 1,120 | 2,380 (1.70 d) | 1,402 |
| 3. Laser Marker Crimp Depth Set | 41.0 s | 45 min | 84% | 95.0% | 1,400 | 3,080 (2.20 d) | 998 |
| 4. 840-Bar Impulse Burst Audit | 30.1 s | 15 min | 94% | 98.2% | 560 | 1,400 (1.00 d) | 1,587 |
| 5. Barcoded Cap & Kit Bagging | 23.9 s | 10 min | 96% | 99.1% | 280 | 980 (0.70 d) | 2,030 |
Key figures
- Takt time
- 38.6 s
- Lead time
- 8.70 d
- Value-added time
- 153 s
- Process cycle efficiency (PCE)
- 0.033%
- Rolled throughput yield (RTY)
- 89.1%
- Customer demand per day
- 1,400 units
- Line capacity per day
- 998 units
- Bottleneck
- Laser Marker Crimp Depth Set
Reading the bottleneck
The bottleneck is "Laser Marker Crimp Depth Set": it can process 998 units per day against a demand of 1,400 units, so it falls short of demand by 28.7%. Once downtime and scrap are counted, its cycle time grows from 41.0 s to 51.4 s, against a takt of 38.6 s. The largest loss at this step is equipment downtime (uptime 84%), about 7.8 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Hydraulics, Pumps & Valves: Hydraulics, Pumps & Valves
- Swashplate Axial Piston Hydraulic Pump 280cc
- Double-Acting Telescopic Chrome Cylinder
- Proportional Electro-Hydraulic Valve Bank
- Oil-Injected Rotary Screw Air-End 90kW
- High-Chrome Abrasive Mining Slurry Pump
- Right-Angle Helical-Bevel Conveyor Drive
- Multistage Stainless Deep-Well Submersible
- 6MW Offshore Wind Planetary Multiplier
- ISO 15552 Anodized Pneumatic Cylinder Cell
- API-600 Forged Carbon Steel Steam Globe Valve
- Dry Claw Industrial Vacuum Pump Cell