Reverse Logistics & Circular Refurbishment VSM Scenarios

12 scenarios of Reverse Logistics & Circular Refurbishment, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.

Shared steps

All 12 scenarios follow the same flow, from supplier to customer: RMA Return Receipt & Unpack → Data Wipe & Cosmetic Grading → Hardware / Core Repair Cell → Diagnostic Stress & Clean Wrap → Re-Boxed Resale / Pool Issue. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.

Scenario comparison

Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.

ScenarioDemandShiftsTaktLead timePCEBottleneck
Grade-A Smartphone Diagnostics & Battery Refurb850 units per day263.5 s8.90 d0.051%Battery & OLED Micro-Replace
Reusable Foldable Fresh Crate Wash & Loop28,000 crates per day21.9 s8.90 d0.002%ATP Hygiene Luminometer Check
Pooling & EPAL Wooden Pallet Inspection & Repair4,200 units per day212.9 s8.90 d0.010%Replacement Kiln Deck Nail
End-of-Life EV Battery Pack Second-Life SOH24 packs per day11,125 s9.08 d1.8%Cell-Swap Capacity Balancing
Corporate 3-Year Lease Laptop Refurbish Factory640 units per day284.4 s8.91 d0.068%Keycap, Thermal Paste & SSD Fit
Regional Brewery Returnable Bottle Sort & Wash32,000 packs per day21.7 s8.90 d0.001%80°C Caustic Spray Tunnel
Laser Printer Toner Cartridge Remanufacturing1,800 units per day230.0 s8.90 d0.024%New OPC Drum & Doctor Blade
Circular Second-Hand Apparel Steam, Photo & List2,200 garments per day224.5 s8.90 d0.020%360° AI Ghost Mannequin Photo
Small Domestic Coffee & Vacuum Warranty Hub480 units per day156.3 s8.91 d0.091%Safety Earth & Leakage Bench
Hydrometallurgical Gold & Copper E-Waste Shred22 tonnes per day22,455 s9.13 d1.9%Eddy-Current & Electrostatic Sep
Pan-European Automotive Core Return & Credit Hub1,400 units per day238.6 s8.90 d0.031%Fluid Drain & Oil Capture
Decommissioned Fiberglass Wind Blade Cement Co-Feed12 tonnes per day12,250 s9.32 d3.5%Hammer Mill Controlled Fiber