Corporate 3-Year Lease Laptop Refurbish Factory
Product family: Zero-Touch B2B Re-Remarketing.
Flow: Financial Tech Lessors → Asset Tag & BIOS Lock Clear → NIST 800-88 NVMe Sanitize → Keycap, Thermal Paste & SSD Fit → CNC Laser Re-Skin Chassis → Grade A/B Sleeve & Warranty → SMBs & Education Buyers
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Asset Tag & BIOS Lock Clear | 57.0 s | 12 min | 95% | 98.1% | 320 | 1,024 (1.60 d) | 859 |
| 2. NIST 800-88 NVMe Sanitize | 68.0 s | 15 min | 92% | 96.4% | 256 | 1,152 (1.80 d) | 675 |
| 3. Keycap, Thermal Paste & SSD Fit | 91.0 s | 20 min | 84% | 92.5% | 320 | 1,536 (2.40 d) | 441 |
| 4. CNC Laser Re-Skin Chassis | 62.0 s | 8 min | 95% | 98.2% | 160 | 576 (0.90 d) | 784 |
| 5. Grade A/B Sleeve & Warranty | 47.0 s | 8 min | 97% | 99.4% | 160 | 512 (0.80 d) | 1,068 |
Key figures
- Takt time
- 84.4 s
- Lead time
- 8.91 d
- Value-added time
- 325 s
- Process cycle efficiency (PCE)
- 0.068%
- Rolled throughput yield (RTY)
- 85.4%
- Customer demand per day
- 640 units
- Line capacity per day
- 441 units
- Bottleneck
- Keycap, Thermal Paste & SSD Fit
Reading the bottleneck
The bottleneck is "Keycap, Thermal Paste & SSD Fit": it can process 441 units per day against a demand of 640 units, so it falls short of demand by 31.2%. Once downtime and scrap are counted, its cycle time grows from 91.0 s to 117 s, against a takt of 84.4 s. The largest loss at this step is equipment downtime (uptime 84%), about 17.3 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Reverse Logistics & Circular Refurbishment: Reverse Logistics & Circular Refurbishment
- Grade-A Smartphone Diagnostics & Battery Refurb
- Reusable Foldable Fresh Crate Wash & Loop
- Pooling & EPAL Wooden Pallet Inspection & Repair
- End-of-Life EV Battery Pack Second-Life SOH
- Regional Brewery Returnable Bottle Sort & Wash
- Laser Printer Toner Cartridge Remanufacturing
- Circular Second-Hand Apparel Steam, Photo & List
- Small Domestic Coffee & Vacuum Warranty Hub
- Hydrometallurgical Gold & Copper E-Waste Shred
- Pan-European Automotive Core Return & Credit Hub
- Decommissioned Fiberglass Wind Blade Cement Co-Feed