End-of-Life EV Battery Pack Second-Life SOH
Product family: Reclaimed Stationary BESS Packs.
Flow: Auto Dismantlers & Fleets → HV Safe Discharge & Teardown → Module SoH EIS Impedance → Cell-Swap Capacity Balancing → BESS Cabinet Rack Wiring → 24h Cycle Life BMS Cert → Solar Microgrid Storage
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. HV Safe Discharge & Teardown | 765 s | 12 min | 95% | 98.1% | 12 | 38 (1.58 d) | 31 |
| 2. Module SoH EIS Impedance | 900 s | 15 min | 92% | 96.4% | 10 | 43 (1.79 d) | 24 |
| 3. Cell-Swap Capacity Balancing | 1,215 s | 20 min | 84% | 92.5% | 12 | 58 (2.42 d) | 16 |
| 4. BESS Cabinet Rack Wiring | 833 s | 8 min | 95% | 98.2% | 6 | 22 (0.92 d) | 28 |
| 5. 24h Cycle Life BMS Cert | 630 s | 8 min | 97% | 99.4% | 6 | 19 (0.79 d) | 38 |
Key figures
- Takt time
- 1,125 s
- Lead time
- 9.08 d
- Value-added time
- 4,343 s
- Process cycle efficiency (PCE)
- 1.8%
- Rolled throughput yield (RTY)
- 85.4%
- Customer demand per day
- 24 packs
- Line capacity per day
- 16 packs
- Bottleneck
- Cell-Swap Capacity Balancing
Reading the bottleneck
The bottleneck is "Cell-Swap Capacity Balancing": it can process 16 packs per day against a demand of 24 packs, so it falls short of demand by 34.5%. Once downtime and scrap are counted, its cycle time grows from 1,215 s to 1,564 s, against a takt of 1,125 s. The largest loss at this step is equipment downtime (uptime 84%), about 231 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Reverse Logistics & Circular Refurbishment: Reverse Logistics & Circular Refurbishment
- Grade-A Smartphone Diagnostics & Battery Refurb
- Reusable Foldable Fresh Crate Wash & Loop
- Pooling & EPAL Wooden Pallet Inspection & Repair
- Corporate 3-Year Lease Laptop Refurbish Factory
- Regional Brewery Returnable Bottle Sort & Wash
- Laser Printer Toner Cartridge Remanufacturing
- Circular Second-Hand Apparel Steam, Photo & List
- Small Domestic Coffee & Vacuum Warranty Hub
- Hydrometallurgical Gold & Copper E-Waste Shred
- Pan-European Automotive Core Return & Credit Hub
- Decommissioned Fiberglass Wind Blade Cement Co-Feed