Small Domestic Coffee & Vacuum Warranty Hub
Product family: OEM Authorized Bench Repair.
Flow: Retail Warranty Returns → Ticket & Failure Code Read → Descale, Boiler or PCB Swap → Safety Earth & Leakage Bench → Ultrasonic Steam Detail Clean → Eco Box & Express Ship Back → Consumers & Outlets
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Ticket & Failure Code Read | 38.3 s | 12 min | 95% | 98.1% | 240 | 768 (1.60 d) | 622 |
| 2. Descale, Boiler or PCB Swap | 45.0 s | 15 min | 92% | 96.4% | 192 | 864 (1.80 d) | 488 |
| 3. Safety Earth & Leakage Bench | 61.0 s | 20 min | 84% | 92.5% | 240 | 1,152 (2.40 d) | 313 |
| 4. Ultrasonic Steam Detail Clean | 42.0 s | 8 min | 95% | 98.2% | 120 | 432 (0.90 d) | 557 |
| 5. Eco Box & Express Ship Back | 31.5 s | 8 min | 97% | 99.4% | 120 | 384 (0.80 d) | 768 |
Key figures
- Takt time
- 56.3 s
- Lead time
- 8.91 d
- Value-added time
- 218 s
- Process cycle efficiency (PCE)
- 0.091%
- Rolled throughput yield (RTY)
- 85.4%
- Customer demand per day
- 480 units
- Line capacity per day
- 313 units
- Bottleneck
- Safety Earth & Leakage Bench
Reading the bottleneck
The bottleneck is "Safety Earth & Leakage Bench": it can process 313 units per day against a demand of 480 units, so it falls short of demand by 34.7%. Once downtime and scrap are counted, its cycle time grows from 61.0 s to 78.5 s, against a takt of 56.3 s. The largest loss at this step is equipment downtime (uptime 84%), about 11.6 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Reverse Logistics & Circular Refurbishment: Reverse Logistics & Circular Refurbishment
- Grade-A Smartphone Diagnostics & Battery Refurb
- Reusable Foldable Fresh Crate Wash & Loop
- Pooling & EPAL Wooden Pallet Inspection & Repair
- End-of-Life EV Battery Pack Second-Life SOH
- Corporate 3-Year Lease Laptop Refurbish Factory
- Regional Brewery Returnable Bottle Sort & Wash
- Laser Printer Toner Cartridge Remanufacturing
- Circular Second-Hand Apparel Steam, Photo & List
- Hydrometallurgical Gold & Copper E-Waste Shred
- Pan-European Automotive Core Return & Credit Hub
- Decommissioned Fiberglass Wind Blade Cement Co-Feed