Hydrometallurgical Gold & Copper E-Waste Shred
Product family: Urban Mining Concentrate.
Flow: ITAD & Telecom Scrap Pools → Battery & Capacitor Depollute → Dual-Shaft Granulator Mill → Eddy-Current & Electrostatic Sep → Optical Concentrate Assay XRF → Sealed Bulk Drum Dispatch → Precious Metal Smelters
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Battery & Capacitor Depollute | 1,669 s | 12 min | 95% | 98.1% | 11 | 35 (1.59 d) | 29 |
| 2. Dual-Shaft Granulator Mill | 1,964 s | 15 min | 92% | 96.4% | 9 | 40 (1.82 d) | 23 |
| 3. Eddy-Current & Electrostatic Sep | 2,651 s | 20 min | 84% | 92.5% | 11 | 53 (2.41 d) | 15 |
| 4. Optical Concentrate Assay XRF | 1,816 s | 8 min | 95% | 98.2% | 6 | 20 (0.91 d) | 27 |
| 5. Sealed Bulk Drum Dispatch | 1,375 s | 8 min | 97% | 99.4% | 6 | 18 (0.82 d) | 37 |
Key figures
- Takt time
- 2,455 s
- Lead time
- 9.13 d
- Value-added time
- 9,475 s
- Process cycle efficiency (PCE)
- 1.9%
- Rolled throughput yield (RTY)
- 85.4%
- Customer demand per day
- 22 tonnes
- Line capacity per day
- 15 tonnes
- Bottleneck
- Eddy-Current & Electrostatic Sep
Reading the bottleneck
The bottleneck is "Eddy-Current & Electrostatic Sep": it can process 15 tonnes per day against a demand of 22 tonnes, so it falls short of demand by 31.3%. Once downtime and scrap are counted, its cycle time grows from 2,651 s to 3,412 s, against a takt of 2,455 s. The largest loss at this step is equipment downtime (uptime 84%), about 505 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Reverse Logistics & Circular Refurbishment: Reverse Logistics & Circular Refurbishment
- Grade-A Smartphone Diagnostics & Battery Refurb
- Reusable Foldable Fresh Crate Wash & Loop
- Pooling & EPAL Wooden Pallet Inspection & Repair
- End-of-Life EV Battery Pack Second-Life SOH
- Corporate 3-Year Lease Laptop Refurbish Factory
- Regional Brewery Returnable Bottle Sort & Wash
- Laser Printer Toner Cartridge Remanufacturing
- Circular Second-Hand Apparel Steam, Photo & List
- Small Domestic Coffee & Vacuum Warranty Hub
- Pan-European Automotive Core Return & Credit Hub
- Decommissioned Fiberglass Wind Blade Cement Co-Feed