Hydrometallurgical Gold & Copper E-Waste Shred

Product family: Urban Mining Concentrate.

Flow: ITAD & Telecom Scrap Pools → Battery & Capacitor Depollute → Dual-Shaft Granulator Mill → Eddy-Current & Electrostatic Sep → Optical Concentrate Assay XRF → Sealed Bulk Drum Dispatch → Precious Metal Smelters

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Hydrometallurgical Gold & Copper E-Waste ShredSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. ITAD & Telecom Scrap Pools → Battery & Capacitor Depollute (1,669 s) → Dual-Shaft Granulator Mill (1,964 s) → Eddy-Current & Electrostatic Sep (2,651 s) → Optical Concentrate Assay XRF (1,816 s) → Sealed Bulk Drum Dispatch (1,375 s) → Precious Metal Smelters.SUPPLIERITAD & TelecomScrap PoolsI1.59 d1Battery &Capacitor…C/T 1,669 sI1.82 d2Dual-ShaftGranulator MillC/T 1,964 sI2.41 d3Eddy-Current &Electrostatic SepC/T 2,651 sI0.91 d4OpticalConcentrate Assa…C/T 1,816 sI0.82 d5Sealed Bulk DrumDispatchC/T 1,375 sI1.41 dCUSTOMERPrecious MetalSmelters22 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Battery & Capacitor Depollute1,669 s12 min95%98.1%1135 (1.59 d)29
2. Dual-Shaft Granulator Mill1,964 s15 min92%96.4%940 (1.82 d)23
3. Eddy-Current & Electrostatic Sep2,651 s20 min84%92.5%1153 (2.41 d)15
4. Optical Concentrate Assay XRF1,816 s8 min95%98.2%620 (0.91 d)27
5. Sealed Bulk Drum Dispatch1,375 s8 min97%99.4%618 (0.82 d)37

Key figures

Takt time
2,455 s
Lead time
9.13 d
Value-added time
9,475 s
Process cycle efficiency (PCE)
1.9%
Rolled throughput yield (RTY)
85.4%
Customer demand per day
22 tonnes
Line capacity per day
15 tonnes
Bottleneck
Eddy-Current & Electrostatic Sep

Reading the bottleneck

The bottleneck is "Eddy-Current & Electrostatic Sep": it can process 15 tonnes per day against a demand of 22 tonnes, so it falls short of demand by 31.3%. Once downtime and scrap are counted, its cycle time grows from 2,651 s to 3,412 s, against a takt of 2,455 s. The largest loss at this step is equipment downtime (uptime 84%), about 505 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.