Regional Brewery Returnable Bottle Sort & Wash
Product family: Refillable Crated Beer Loops.
Flow: Pubs & Supermarket Reverse → Acoustic Foreign-Bottle Kick → Crate Unpack & Label Soak → 80°C Caustic Spray Tunnel → Camera Rim Chip Scuff Audit → Clean Pallet to Bottling Hall → Craft & Regional Breweries
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Acoustic Foreign-Bottle Kick | 1.2 s | 12 min | 95% | 98.1% | 16,000 | 51,200 (1.60 d) | 40,819 |
| 2. Crate Unpack & Label Soak | 1.4 s | 15 min | 92% | 96.4% | 12,800 | 57,600 (1.80 d) | 32,783 |
| 3. 80°C Caustic Spray Tunnel | 1.8 s | 20 min | 84% | 92.5% | 16,000 | 76,800 (2.40 d) | 22,274 |
| 4. Camera Rim Chip Scuff Audit | 1.2 s | 8 min | 95% | 98.2% | 8,000 | 28,800 (0.90 d) | 40,488 |
| 5. Clean Pallet to Bottling Hall | 1.2 s | 8 min | 97% | 99.4% | 8,000 | 25,600 (0.80 d) | 41,845 |
Key figures
- Takt time
- 1.7 s
- Lead time
- 8.90 d
- Value-added time
- 6.8 s
- Process cycle efficiency (PCE)
- 0.001%
- Rolled throughput yield (RTY)
- 85.4%
- Customer demand per day
- 32,000 packs
- Line capacity per day
- 22,274 packs
- Bottleneck
- 80°C Caustic Spray Tunnel
Reading the bottleneck
The bottleneck is "80°C Caustic Spray Tunnel": it can process 22,274 packs per day against a demand of 32,000 packs, so it falls short of demand by 30.4%. Once downtime and scrap are counted, its cycle time grows from 1.8 s to 2.3 s, against a takt of 1.7 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.3 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Reverse Logistics & Circular Refurbishment: Reverse Logistics & Circular Refurbishment
- Grade-A Smartphone Diagnostics & Battery Refurb
- Reusable Foldable Fresh Crate Wash & Loop
- Pooling & EPAL Wooden Pallet Inspection & Repair
- End-of-Life EV Battery Pack Second-Life SOH
- Corporate 3-Year Lease Laptop Refurbish Factory
- Laser Printer Toner Cartridge Remanufacturing
- Circular Second-Hand Apparel Steam, Photo & List
- Small Domestic Coffee & Vacuum Warranty Hub
- Hydrometallurgical Gold & Copper E-Waste Shred
- Pan-European Automotive Core Return & Credit Hub
- Decommissioned Fiberglass Wind Blade Cement Co-Feed