Reusable Foldable Fresh Crate Wash & Loop
Product family: Sanitized Food Pooling Crates.
Flow: Supermarket Backroom Drops → Auto Unfold & Label Scrape → 3-Stage 70°C Hydro Tunnel → ATP Hygiene Luminometer Check → Auto Fold & Stack 120-Pallet → Farm Order Pool Dispatch → Farms & Fresh Packhouses
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Auto Unfold & Label Scrape | 1.3 s | 12 min | 95% | 98.1% | 14,000 | 44,800 (1.60 d) | 37,679 |
| 2. 3-Stage 70°C Hydro Tunnel | 1.5 s | 15 min | 92% | 96.4% | 11,200 | 50,400 (1.80 d) | 30,597 |
| 3. ATP Hygiene Luminometer Check | 2.1 s | 20 min | 84% | 92.5% | 14,000 | 67,200 (2.40 d) | 19,092 |
| 4. Auto Fold & Stack 120-Pallet | 1.4 s | 8 min | 95% | 98.2% | 7,000 | 25,200 (0.90 d) | 34,704 |
| 5. Farm Order Pool Dispatch | 1.2 s | 8 min | 97% | 99.4% | 7,000 | 22,400 (0.80 d) | 41,845 |
Key figures
- Takt time
- 1.9 s
- Lead time
- 8.90 d
- Value-added time
- 7.5 s
- Process cycle efficiency (PCE)
- 0.002%
- Rolled throughput yield (RTY)
- 85.4%
- Customer demand per day
- 28,000 crates
- Line capacity per day
- 19,092 crates
- Bottleneck
- ATP Hygiene Luminometer Check
Reading the bottleneck
The bottleneck is "ATP Hygiene Luminometer Check": it can process 19,092 crates per day against a demand of 28,000 crates, so it falls short of demand by 31.8%. Once downtime and scrap are counted, its cycle time grows from 2.1 s to 2.7 s, against a takt of 1.9 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.4 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Reverse Logistics & Circular Refurbishment: Reverse Logistics & Circular Refurbishment
- Grade-A Smartphone Diagnostics & Battery Refurb
- Pooling & EPAL Wooden Pallet Inspection & Repair
- End-of-Life EV Battery Pack Second-Life SOH
- Corporate 3-Year Lease Laptop Refurbish Factory
- Regional Brewery Returnable Bottle Sort & Wash
- Laser Printer Toner Cartridge Remanufacturing
- Circular Second-Hand Apparel Steam, Photo & List
- Small Domestic Coffee & Vacuum Warranty Hub
- Hydrometallurgical Gold & Copper E-Waste Shred
- Pan-European Automotive Core Return & Credit Hub
- Decommissioned Fiberglass Wind Blade Cement Co-Feed