Pooling & EPAL Wooden Pallet Inspection & Repair

Product family: Recertified Pooling Pallets.

Flow: Retailer Return Trailers → Robot Tilt Flip & Nail Scan → Damaged Board Pneumatic Strip → Replacement Kiln Deck Nail → Block Check & Blue Paint Mist → A-Grade Stack & Outbound → FMCG Plant Loading Docks

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Pooling & EPAL Wooden Pallet Inspection & RepairSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Retailer Return Trailers → Robot Tilt Flip & Nail Scan (8.7 s) → Damaged Board Pneumatic Strip (10.3 s) → Replacement Kiln Deck Nail (13.9 s) → Block Check & Blue Paint Mist (9.5 s) → A-Grade Stack & Outbound (7.2 s) → FMCG Plant Loading Docks.SUPPLIERRetailer ReturnTrailersI1.60 d1Robot Tilt Flip &Nail ScanC/T 8.7 sI1.80 d2Damaged BoardPneumatic StripC/T 10.3 sI2.40 d3Replacement KilnDeck NailC/T 13.9 sI0.90 d4Block Check &Blue Paint MistC/T 9.5 sI0.80 d5A-Grade Stack &OutboundC/T 7.2 sI1.40 dCUSTOMERFMCG PlantLoading Docks4,200 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Robot Tilt Flip & Nail Scan8.7 s12 min95%98.1%2,1006,720 (1.60 d)5,630
2. Damaged Board Pneumatic Strip10.3 s15 min92%96.4%1,6807,560 (1.80 d)4,456
3. Replacement Kiln Deck Nail13.9 s20 min84%92.5%2,10010,080 (2.40 d)2,884
4. Block Check & Blue Paint Mist9.5 s8 min95%98.2%1,0503,780 (0.90 d)5,114
5. A-Grade Stack & Outbound7.2 s8 min97%99.4%1,0503,360 (0.80 d)6,974

Key figures

Takt time
12.9 s
Lead time
8.90 d
Value-added time
49.6 s
Process cycle efficiency (PCE)
0.010%
Rolled throughput yield (RTY)
85.4%
Customer demand per day
4,200 units
Line capacity per day
2,884 units
Bottleneck
Replacement Kiln Deck Nail

Reading the bottleneck

The bottleneck is "Replacement Kiln Deck Nail": it can process 2,884 units per day against a demand of 4,200 units, so it falls short of demand by 31.3%. Once downtime and scrap are counted, its cycle time grows from 13.9 s to 17.9 s, against a takt of 12.9 s. The largest loss at this step is equipment downtime (uptime 84%), about 2.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.