Pan-European Automotive Core Return & Credit Hub
Product family: Turbo, Alternator & Caliper Cores.
Flow: IAM Workshop Return Milkruns → Barcode Receipt & Core Match → No-Crack Visual Core Credit → Fluid Drain & Oil Capture → Vendor-Grouped Reman Pallet → Automated Core Refund Credit → Tier-1 Reman Factories
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Barcode Receipt & Core Match | 26.2 s | 12 min | 95% | 98.1% | 700 | 2,240 (1.60 d) | 1,870 |
| 2. No-Crack Visual Core Credit | 30.9 s | 15 min | 92% | 96.4% | 560 | 2,520 (1.80 d) | 1,485 |
| 3. Fluid Drain & Oil Capture | 42.0 s | 20 min | 84% | 92.5% | 700 | 3,360 (2.40 d) | 955 |
| 4. Vendor-Grouped Reman Pallet | 28.5 s | 8 min | 95% | 98.2% | 350 | 1,260 (0.90 d) | 1,705 |
| 5. Automated Core Refund Credit | 21.6 s | 8 min | 97% | 99.4% | 350 | 1,120 (0.80 d) | 2,325 |
Key figures
- Takt time
- 38.6 s
- Lead time
- 8.90 d
- Value-added time
- 149 s
- Process cycle efficiency (PCE)
- 0.031%
- Rolled throughput yield (RTY)
- 85.4%
- Customer demand per day
- 1,400 units
- Line capacity per day
- 955 units
- Bottleneck
- Fluid Drain & Oil Capture
Reading the bottleneck
The bottleneck is "Fluid Drain & Oil Capture": it can process 955 units per day against a demand of 1,400 units, so it falls short of demand by 31.8%. Once downtime and scrap are counted, its cycle time grows from 42.0 s to 54.1 s, against a takt of 38.6 s. The largest loss at this step is equipment downtime (uptime 84%), about 8.0 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Reverse Logistics & Circular Refurbishment: Reverse Logistics & Circular Refurbishment
- Grade-A Smartphone Diagnostics & Battery Refurb
- Reusable Foldable Fresh Crate Wash & Loop
- Pooling & EPAL Wooden Pallet Inspection & Repair
- End-of-Life EV Battery Pack Second-Life SOH
- Corporate 3-Year Lease Laptop Refurbish Factory
- Regional Brewery Returnable Bottle Sort & Wash
- Laser Printer Toner Cartridge Remanufacturing
- Circular Second-Hand Apparel Steam, Photo & List
- Small Domestic Coffee & Vacuum Warranty Hub
- Hydrometallurgical Gold & Copper E-Waste Shred
- Decommissioned Fiberglass Wind Blade Cement Co-Feed