Laser Printer Toner Cartridge Remanufacturing
Product family: Eco Refilled OEM Cartridges.
Flow: Office Collection Boxes → Chip Reset & Split Housing → Vacuum Waste Hopper Purge → New OPC Drum & Doctor Blade → Gravimetric Polymer Toner Fill → 10-Page Print Density Test → Corporate Managed Print
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Chip Reset & Split Housing | 20.4 s | 12 min | 95% | 98.1% | 900 | 2,880 (1.60 d) | 2,401 |
| 2. Vacuum Waste Hopper Purge | 24.0 s | 15 min | 92% | 96.4% | 720 | 3,240 (1.80 d) | 1,912 |
| 3. New OPC Drum & Doctor Blade | 32.4 s | 20 min | 84% | 92.5% | 900 | 4,320 (2.40 d) | 1,237 |
| 4. Gravimetric Polymer Toner Fill | 22.2 s | 8 min | 95% | 98.2% | 450 | 1,620 (0.90 d) | 2,189 |
| 5. 10-Page Print Density Test | 16.8 s | 8 min | 97% | 99.4% | 450 | 1,440 (0.80 d) | 2,989 |
Key figures
- Takt time
- 30.0 s
- Lead time
- 8.90 d
- Value-added time
- 116 s
- Process cycle efficiency (PCE)
- 0.024%
- Rolled throughput yield (RTY)
- 85.4%
- Customer demand per day
- 1,800 units
- Line capacity per day
- 1,237 units
- Bottleneck
- New OPC Drum & Doctor Blade
Reading the bottleneck
The bottleneck is "New OPC Drum & Doctor Blade": it can process 1,237 units per day against a demand of 1,800 units, so it falls short of demand by 31.3%. Once downtime and scrap are counted, its cycle time grows from 32.4 s to 41.7 s, against a takt of 30.0 s. The largest loss at this step is equipment downtime (uptime 84%), about 6.2 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Reverse Logistics & Circular Refurbishment: Reverse Logistics & Circular Refurbishment
- Grade-A Smartphone Diagnostics & Battery Refurb
- Reusable Foldable Fresh Crate Wash & Loop
- Pooling & EPAL Wooden Pallet Inspection & Repair
- End-of-Life EV Battery Pack Second-Life SOH
- Corporate 3-Year Lease Laptop Refurbish Factory
- Regional Brewery Returnable Bottle Sort & Wash
- Circular Second-Hand Apparel Steam, Photo & List
- Small Domestic Coffee & Vacuum Warranty Hub
- Hydrometallurgical Gold & Copper E-Waste Shred
- Pan-European Automotive Core Return & Credit Hub
- Decommissioned Fiberglass Wind Blade Cement Co-Feed