Grade-A Smartphone Diagnostics & Battery Refurb

Product family: Certified Circular Smartphones.

Flow: Carrier Trade-In Pools → IMEI Blacklist & Grade Photo → Certified Data Wipe & Flash → Battery & OLED Micro-Replace → 60-Point Automated Test App → Ultrasonic Polish & Eco Box → Refurbished Marketplaces

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Grade-A Smartphone Diagnostics & Battery RefurbSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Carrier Trade-In Pools → IMEI Blacklist & Grade Photo (43.0 s) → Certified Data Wipe & Flash (51.0 s) → Battery & OLED Micro-Replace (69.0 s) → 60-Point Automated Test App (47.0 s) → Ultrasonic Polish & Eco Box (35.6 s) → Refurbished Marketplaces.SUPPLIERCarrierTrade-In PoolsI1.60 d1IMEI Blacklist &Grade PhotoC/T 43.0 sI1.80 d2Certified DataWipe & FlashC/T 51.0 sI2.40 d3Battery & OLEDMicro-ReplaceC/T 69.0 sI0.90 d460-PointAutomated Test…C/T 47.0 sI0.80 d5Ultrasonic Polish& Eco BoxC/T 35.6 sI1.40 dCUSTOMERRefurbishedMarketplaces850 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. IMEI Blacklist & Grade Photo43.0 s12 min95%98.1%4251,360 (1.60 d)1,139
2. Certified Data Wipe & Flash51.0 s15 min92%96.4%3401,530 (1.80 d)900
3. Battery & OLED Micro-Replace69.0 s20 min84%92.5%4252,040 (2.40 d)581
4. 60-Point Automated Test App47.0 s8 min95%98.2%213765 (0.90 d)1,034
5. Ultrasonic Polish & Eco Box35.6 s8 min97%99.4%213680 (0.80 d)1,411

Key figures

Takt time
63.5 s
Lead time
8.90 d
Value-added time
246 s
Process cycle efficiency (PCE)
0.051%
Rolled throughput yield (RTY)
85.4%
Customer demand per day
850 units
Line capacity per day
581 units
Bottleneck
Battery & OLED Micro-Replace

Reading the bottleneck

The bottleneck is "Battery & OLED Micro-Replace": it can process 581 units per day against a demand of 850 units, so it falls short of demand by 31.6%. Once downtime and scrap are counted, its cycle time grows from 69.0 s to 88.8 s, against a takt of 63.5 s. The largest loss at this step is equipment downtime (uptime 84%), about 13.1 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.