Cosmetics, Dermocare & Fragrances VSM Scenarios
12 scenarios of Cosmetics, Dermocare & Fragrances, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Vacuum Homogenizer Emulsion → Microbiology Hold & Bulk QC → Rotary Fill, Pump Crimp & Torque → Sleeving, Laser Lot & Cellophane → Display Tray & Export Case Pack. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| Airless Pipette Hyaluronic Anti-Aging Serum | 14,000 vials per day | 2 | 3.9 s | 9.50 d | 0.003% | Monoblock Fill & Torque Drop |
| Water-Resistant Mineral SPF50+ Tube Line | 24,000 packs per day | 2 | 2.3 s | 9.50 d | 0.002% | Hot-Air PE Tube Weld & Fill |
| Sulfate-Free Botanical Shampoo 400mL rPET | 36,000 packs per day | 3 | 2.3 s | 9.50 d | 0.001% | 18-Head Flowmeter Fill & Cap |
| Luxury EDP Eau de Parfum Alcohol Maceration | 8,500 vials per day | 2 | 6.4 s | 9.50 d | 0.005% | Vacuum Fill & Pump Crimp |
| Talc-Free Mineral Pressed Powder Compact Line | 19,000 units per day | 2 | 2.8 s | 9.50 d | 0.002% | Robotic Godet Drop-In Compact |
| Fluoride Whitening Laminated Tube Fill Line | 65,000 packs per day | 3 | 1.2 s | 9.50 d | 0.001% | Hot-Jaw Lami Seal & Trim |
| Butane-Propelled 150mL Aluminum Aerosol Line | 52,000 packs per day | 3 | 1.6 s | 9.50 d | 0.001% | 50°C Hot-Water Tank Leak Check |
| Biodegradable Viscose Baby & Micellar Wipe Line | 42,000 packs per day | 3 | 1.9 s | 9.50 d | 0.001% | Horizontal Flowpack & Die-Cut |
| Silicone-Free Satin Lipstick Bullet Molding | 16,000 units per day | 2 | 3.4 s | 9.50 d | 0.003% | Cold Tunnel Chill & Air Eject |
| Ammonia-Free Cream Hair Color & Developer Kit | 14,000 packs per day | 2 | 3.9 s | 9.50 d | 0.003% | Glove, Leaflet & Conditioner |
| Hypoallergenic Mild Surfactant Baby Pump Bottle | 28,000 packs per day | 2 | 1.9 s | 9.50 d | 0.002% | Inline Piston Fill & Pump Fit |
| Hydrogel Bio-Cellulose Facial Sheet Mask Line | 48,000 packs per day | 2 | 1.1 s | 9.50 d | 0.001% | Top Heat-Seal & Burst Check |