Hydrogel Bio-Cellulose Facial Sheet Mask Line

Product family: Single-Serve Foil Mask Pouches.

Flow: Lyocell & Fermented Bio-Cellulose → Die-Cut Fold Sheet Mask Insert → Rotary Sachet Essence Dosing → Top Heat-Seal & Burst Check → OCR Date Stamp & Checkweigh → Display Box 10-Count Pack → K-Beauty & EU Pharmacies

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Hydrogel Bio-Cellulose Facial Sheet Mask LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Lyocell & Fermented Bio-Cellulose → Die-Cut Fold Sheet Mask Insert (1.2 s) → Rotary Sachet Essence Dosing (1.2 s) → Top Heat-Seal & Burst Check (1.2 s) → OCR Date Stamp & Checkweigh (1.2 s) → Display Box 10-Count Pack (1.2 s) → K-Beauty & EU Pharmacies.SUPPLIERLyocell &FermentedBio-CelluloseI1.70 d1Die-Cut FoldSheet Mask InsertC/T 1.2 sI2.20 d2Rotary SachetEssence DosingC/T 1.2 sI1.80 d3Top Heat-Seal &Burst CheckC/T 1.2 sI1.00 d4OCR Date Stamp &CheckweighC/T 1.2 sI0.80 d5Display Box10-Count PackC/T 1.2 sI2.00 dCUSTOMERK-Beauty & EUPharmacies48,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Die-Cut Fold Sheet Mask Insert1.2 s60 min93%98.8%72,00081,600 (1.70 d)39,510
2. Rotary Sachet Essence Dosing1.2 s15 min92%98.2%72,000105,600 (2.20 d)40,203
3. Top Heat-Seal & Burst Check1.2 s55 min84%96.4%48,00086,400 (1.80 d)34,212
4. OCR Date Stamp & Checkweigh1.2 s20 min93%98.4%24,00048,000 (1.00 d)39,350
5. Display Box 10-Count Pack1.2 s10 min97%99.4%19,20038,400 (0.80 d)42,183

Key figures

Takt time
1.1 s
Lead time
9.50 d
Value-added time
6.0 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
91.5%
Customer demand per day
48,000 packs
Line capacity per day
34,212 packs
Bottleneck
Top Heat-Seal & Burst Check

Reading the bottleneck

The bottleneck is "Top Heat-Seal & Burst Check": it can process 34,212 packs per day against a demand of 48,000 packs, so it falls short of demand by 28.7%. Once downtime and scrap are counted, its cycle time grows from 1.2 s to 1.5 s, against a takt of 1.1 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.