Sulfate-Free Botanical Shampoo 400mL rPET

Product family: Circular Haircare Line.

Flow: Surfactant & rPET Suppliers → Inline Cold-Mix Surfactants → Microbiota Preservative QC → 18-Head Flowmeter Fill & Cap → Front/Back Clear Film Label → Shrink 6-Pack & Robot Pallet → Global Supermarkets

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Sulfate-Free Botanical Shampoo 400mL rPETSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Surfactant & rPET Suppliers → Inline Cold-Mix Surfactants (1.6 s) → Microbiota Preservative QC (1.8 s) → 18-Head Flowmeter Fill & Cap (2.4 s) → Front/Back Clear Film Label (1.7 s) → Shrink 6-Pack & Robot Pallet (1.3 s) → Global Supermarkets.SUPPLIERSurfactant &rPET SuppliersI1.70 d1Inline Cold-MixSurfactantsC/T 1.6 sI2.20 d2MicrobiotaPreservative QCC/T 1.8 sI1.80 d318-Head FlowmeterFill & CapC/T 2.4 sI1.00 d4Front/Back ClearFilm LabelC/T 1.7 sI0.80 d5Shrink 6-Pack &Robot PalletC/T 1.3 sI2.00 dCUSTOMERGlobalSupermarkets36,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Inline Cold-Mix Surfactants1.6 s60 min93%98.8%54,00061,200 (1.70 d)45,138
2. Microbiota Preservative QC1.8 s15 min92%98.2%54,00079,200 (2.20 d)40,354
3. 18-Head Flowmeter Fill & Cap2.4 s55 min84%96.4%36,00064,800 (1.80 d)26,216
4. Front/Back Clear Film Label1.7 s20 min93%98.4%18,00036,000 (1.00 d)42,311
5. Shrink 6-Pack & Robot Pallet1.3 s10 min97%99.4%14,40028,800 (0.80 d)58,963

Key figures

Takt time
2.3 s
Lead time
9.50 d
Value-added time
8.8 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
91.5%
Customer demand per day
36,000 packs
Line capacity per day
26,216 packs
Bottleneck
18-Head Flowmeter Fill & Cap

Reading the bottleneck

The bottleneck is "18-Head Flowmeter Fill & Cap": it can process 26,216 packs per day against a demand of 36,000 packs, so it falls short of demand by 27.2%. Once downtime and scrap are counted, its cycle time grows from 2.4 s to 3.0 s, against a takt of 2.3 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.