Ammonia-Free Cream Hair Color & Developer Kit

Product family: Multi-Component Kitting Line.

Flow: Bulk Tube Suppliers → Cream Color Tube & Crimping → H2O2 Oxidant Bottle Fill → Glove, Leaflet & Conditioner → 4-Feed High-Speed Cartoner → Checkweigh Missing-Item Gate → Retail Pharmacy & Salons

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Ammonia-Free Cream Hair Color & Developer KitSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Bulk Tube Suppliers → Cream Color Tube & Crimping (2.8 s) → H2O2 Oxidant Bottle Fill (3.1 s) → Glove, Leaflet & Conditioner (4.1 s) → 4-Feed High-Speed Cartoner (2.9 s) → Checkweigh Missing-Item Gate (2.2 s) → Retail Pharmacy & Salons.SUPPLIERBulk TubeSuppliersI1.70 d1Cream Color Tube& CrimpingC/T 2.8 sI2.20 d2H2O2 OxidantBottle FillC/T 3.1 sI1.80 d3Glove, Leaflet &ConditionerC/T 4.1 sI1.00 d44-Feed High-SpeedCartonerC/T 2.9 sI0.80 d5CheckweighMissing-Item GateC/T 2.2 sI2.00 dCUSTOMERRetail Pharmacy& Salons14,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Cream Color Tube & Crimping2.8 s60 min93%98.8%21,00023,800 (1.70 d)16,933
2. H2O2 Oxidant Bottle Fill3.1 s15 min92%98.2%21,00030,800 (2.20 d)15,562
3. Glove, Leaflet & Conditioner4.1 s55 min84%96.4%14,00025,200 (1.80 d)10,013
4. 4-Feed High-Speed Cartoner2.9 s20 min93%98.4%7,00014,000 (1.00 d)16,283
5. Checkweigh Missing-Item Gate2.2 s10 min97%99.4%5,60011,200 (0.80 d)23,009

Key figures

Takt time
3.9 s
Lead time
9.50 d
Value-added time
15.1 s
Process cycle efficiency (PCE)
0.003%
Rolled throughput yield (RTY)
91.5%
Customer demand per day
14,000 packs
Line capacity per day
10,013 packs
Bottleneck
Glove, Leaflet & Conditioner

Reading the bottleneck

The bottleneck is "Glove, Leaflet & Conditioner": it can process 10,013 packs per day against a demand of 14,000 packs, so it falls short of demand by 28.5%. Once downtime and scrap are counted, its cycle time grows from 4.1 s to 5.1 s, against a takt of 3.9 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Cosmetics, Dermocare & Fragrances: Cosmetics, Dermocare & Fragrances