Fluoride Whitening Laminated Tube Fill Line

Product family: 300bpm High-Speed Oral Care.

Flow: Laminate Tube Supplier → Vacuum Paste Kettle Mill → Twin-Nozzle Tube Orientation → Hot-Jaw Lami Seal & Trim → High-Speed Cartoner 300/min → Master Case Stretch Wrap → Mass Retail Chains

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Fluoride Whitening Laminated Tube Fill LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Laminate Tube Supplier → Vacuum Paste Kettle Mill (1.2 s) → Twin-Nozzle Tube Orientation (1.2 s) → Hot-Jaw Lami Seal & Trim (1.3 s) → High-Speed Cartoner 300/min (1.2 s) → Master Case Stretch Wrap (1.2 s) → Mass Retail Chains.SUPPLIERLaminate TubeSupplierI1.70 d1Vacuum PasteKettle MillC/T 1.2 sI2.20 d2Twin-Nozzle TubeOrientationC/T 1.2 sI1.80 d3Hot-Jaw Lami Seal& TrimC/T 1.3 sI1.00 d4High-SpeedCartoner 300/minC/T 1.2 sI0.80 d5Master CaseStretch WrapC/T 1.2 sI2.00 dCUSTOMERMass RetailChains65,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Vacuum Paste Kettle Mill1.2 s60 min93%98.8%97,500110,500 (1.70 d)60,184
2. Twin-Nozzle Tube Orientation1.2 s15 min92%98.2%97,500143,000 (2.20 d)60,530
3. Hot-Jaw Lami Seal & Trim1.3 s55 min84%96.4%65,000117,000 (1.80 d)48,399
4. High-Speed Cartoner 300/min1.2 s20 min93%98.4%32,50065,000 (1.00 d)59,940
5. Master Case Stretch Wrap1.2 s10 min97%99.4%26,00052,000 (0.80 d)63,877

Key figures

Takt time
1.2 s
Lead time
9.50 d
Value-added time
6.1 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
91.5%
Customer demand per day
65,000 packs
Line capacity per day
48,399 packs
Bottleneck
Hot-Jaw Lami Seal & Trim

Reading the bottleneck

The bottleneck is "Hot-Jaw Lami Seal & Trim": it can process 48,399 packs per day against a demand of 65,000 packs, so it falls short of demand by 25.5%. Once downtime and scrap are counted, its cycle time grows from 1.3 s to 1.6 s, against a takt of 1.2 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.