Talc-Free Mineral Pressed Powder Compact Line

Product family: Refillable Magnetic Compacts.

Flow: Pigment & Aluminium Pan Suppliers → Cryo Micronized Pigment Mill → Binder Oil Spray & Press Cake → Robotic Godet Drop-In Compact → Laser Dust-Clean & Shade Cam → Compact Mirror Film & Sleeve → Color Cosmetics Brands

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Talc-Free Mineral Pressed Powder Compact LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Pigment & Aluminium Pan Suppliers → Cryo Micronized Pigment Mill (2.0 s) → Binder Oil Spray & Press Cake (2.3 s) → Robotic Godet Drop-In Compact (3.0 s) → Laser Dust-Clean & Shade Cam (2.2 s) → Compact Mirror Film & Sleeve (1.6 s) → Color Cosmetics Brands.SUPPLIERPigment &Aluminium PanSuppliersI1.70 d1Cryo MicronizedPigment MillC/T 2.0 sI2.20 d2Binder Oil Spray& Press CakeC/T 2.3 sI1.80 d3Robotic GodetDrop-In CompactC/T 3.0 sI1.00 d4Laser Dust-Clean& Shade CamC/T 2.2 sI0.80 d5Compact MirrorFilm & SleeveC/T 1.6 sI2.00 dCUSTOMERColor CosmeticsBrands19,000 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Cryo Micronized Pigment Mill2.0 s60 min93%98.8%28,50032,300 (1.70 d)23,706
2. Binder Oil Spray & Press Cake2.3 s15 min92%98.2%28,50041,800 (2.20 d)20,976
3. Robotic Godet Drop-In Compact3.0 s55 min84%96.4%19,00034,200 (1.80 d)13,685
4. Laser Dust-Clean & Shade Cam2.2 s20 min93%98.4%9,50019,000 (1.00 d)21,464
5. Compact Mirror Film & Sleeve1.6 s10 min97%99.4%7,60015,200 (0.80 d)31,637

Key figures

Takt time
2.8 s
Lead time
9.50 d
Value-added time
11.1 s
Process cycle efficiency (PCE)
0.002%
Rolled throughput yield (RTY)
91.5%
Customer demand per day
19,000 units
Line capacity per day
13,685 units
Bottleneck
Robotic Godet Drop-In Compact

Reading the bottleneck

The bottleneck is "Robotic Godet Drop-In Compact": it can process 13,685 units per day against a demand of 19,000 units, so it falls short of demand by 28.0%. Once downtime and scrap are counted, its cycle time grows from 3.0 s to 3.7 s, against a takt of 2.8 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.