Airless Pipette Hyaluronic Anti-Aging Serum

Product family: 30mL Prestige Glass Droppers.

Flow: Actives & Glass Dropper Suppliers → High-Shear Vacuum Gel Emulsify → Microbiology & Viscosity Hold → Monoblock Fill & Torque Drop → Hot-Foil Stamp & Laser Lot → Cellophane Wrap & Display → Prestige Beauty Retailers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Airless Pipette Hyaluronic Anti-Aging SerumSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Actives & Glass Dropper Suppliers → High-Shear Vacuum Gel Emulsify (2.8 s) → Microbiology & Viscosity Hold (3.1 s) → Monoblock Fill & Torque Drop (4.1 s) → Hot-Foil Stamp & Laser Lot (2.9 s) → Cellophane Wrap & Display (2.2 s) → Prestige Beauty Retailers.SUPPLIERActives & GlassDropperSuppliersI1.70 d1High-Shear VacuumGel EmulsifyC/T 2.8 sI2.20 d2Microbiology &Viscosity HoldC/T 3.1 sI1.80 d3Monoblock Fill &Torque DropC/T 4.1 sI1.00 d4Hot-Foil Stamp &Laser LotC/T 2.9 sI0.80 d5Cellophane Wrap &DisplayC/T 2.2 sI2.00 dCUSTOMERPrestige BeautyRetailers14,000 / vials

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. High-Shear Vacuum Gel Emulsify2.8 s60 min93%98.8%21,00023,800 (1.70 d)16,933
2. Microbiology & Viscosity Hold3.1 s15 min92%98.2%21,00030,800 (2.20 d)15,562
3. Monoblock Fill & Torque Drop4.1 s55 min84%96.4%14,00025,200 (1.80 d)10,013
4. Hot-Foil Stamp & Laser Lot2.9 s20 min93%98.4%7,00014,000 (1.00 d)16,283
5. Cellophane Wrap & Display2.2 s10 min97%99.4%5,60011,200 (0.80 d)23,009

Key figures

Takt time
3.9 s
Lead time
9.50 d
Value-added time
15.1 s
Process cycle efficiency (PCE)
0.003%
Rolled throughput yield (RTY)
91.5%
Customer demand per day
14,000 vials
Line capacity per day
10,013 vials
Bottleneck
Monoblock Fill & Torque Drop

Reading the bottleneck

The bottleneck is "Monoblock Fill & Torque Drop": it can process 10,013 vials per day against a demand of 14,000 vials, so it falls short of demand by 28.5%. Once downtime and scrap are counted, its cycle time grows from 4.1 s to 5.1 s, against a takt of 3.9 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.