Luxury EDP Eau de Parfum Alcohol Maceration
Product family: 100mL Heavy-Base Flacons.
Flow: Fragrance Oil & Glass Suppliers → ATEX Cold-Chill Maceration → -5°C Chill Polish Filtration → Vacuum Fill & Pump Crimp → Heavy Zinc-Alloy Cap & Ribbon → Cellophane Tight-Fold & Box → Duty-Free & Luxury Stores
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. ATEX Cold-Chill Maceration | 4.6 s | 60 min | 93% | 98.8% | 12,750 | 14,450 (1.70 d) | 10,307 |
| 2. -5°C Chill Polish Filtration | 5.1 s | 15 min | 92% | 98.2% | 12,750 | 18,700 (2.20 d) | 9,460 |
| 3. Vacuum Fill & Pump Crimp | 6.8 s | 55 min | 84% | 96.4% | 8,500 | 15,300 (1.80 d) | 6,037 |
| 4. Heavy Zinc-Alloy Cap & Ribbon | 4.8 s | 20 min | 93% | 98.4% | 4,250 | 8,500 (1.00 d) | 9,838 |
| 5. Cellophane Tight-Fold & Box | 3.6 s | 10 min | 97% | 99.4% | 3,400 | 6,800 (0.80 d) | 14,061 |
Key figures
- Takt time
- 6.4 s
- Lead time
- 9.50 d
- Value-added time
- 24.9 s
- Process cycle efficiency (PCE)
- 0.005%
- Rolled throughput yield (RTY)
- 91.5%
- Customer demand per day
- 8,500 vials
- Line capacity per day
- 6,037 vials
- Bottleneck
- Vacuum Fill & Pump Crimp
Reading the bottleneck
The bottleneck is "Vacuum Fill & Pump Crimp": it can process 6,037 vials per day against a demand of 8,500 vials, so it falls short of demand by 29.0%. Once downtime and scrap are counted, its cycle time grows from 6.8 s to 8.4 s, against a takt of 6.4 s. The largest loss at this step is equipment downtime (uptime 84%), about 1.3 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Cosmetics, Dermocare & Fragrances: Cosmetics, Dermocare & Fragrances
- Airless Pipette Hyaluronic Anti-Aging Serum
- Water-Resistant Mineral SPF50+ Tube Line
- Sulfate-Free Botanical Shampoo 400mL rPET
- Talc-Free Mineral Pressed Powder Compact Line
- Fluoride Whitening Laminated Tube Fill Line
- Butane-Propelled 150mL Aluminum Aerosol Line
- Biodegradable Viscose Baby & Micellar Wipe Line
- Silicone-Free Satin Lipstick Bullet Molding
- Ammonia-Free Cream Hair Color & Developer Kit
- Hypoallergenic Mild Surfactant Baby Pump Bottle
- Hydrogel Bio-Cellulose Facial Sheet Mask Line