In-Vitro Diagnostics (IVD) & Kits VSM Scenarios
12 scenarios of In-Vitro Diagnostics (IVD) & Kits, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Reagent Dispense & Antibody Spray → Controlled-Humidity Laminate → Guillotine Cut & Cassette Click → Desiccant Foil Seal & Vision → Sensitivity Panel QC & Kit Box. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| Rapid Antigen / Cardiac Lateral Flow Strip Line | 85,000 units per day | 3 | 1.0 s | 8.70 d | 0.001% | High-Speed Reel Strip Slit |
| Sample-to-Answer Microfluidic qPCR Cartridge | 14,000 units per day | 3 | 5.8 s | 8.70 d | 0.003% | Laser Foil Valve Welding |
| Gold-Electrode Reel-to-Reel Glucose Test Strip | 160,000 units per day | 3 | 0.5 s | 8.70 d | 0.001% | Enzyme Slot-Die Coat & Dry |
| CMOS Nano-Well DNA Sequencing Flow Cell | 650 units per day | 2 | 83.1 s | 8.71 d | 0.069% | Oligo Surface Lawn Grafting |
| Positive-Charged Silane Pathology Glass Slide | 45,000 samples per day | 2 | 1.2 s | 8.70 d | 0.001% | Ceramic Thermal Tab Print |
| Vacuum PET Blood Collection EDTA Tube Line | 90,000 samples per day | 3 | 0.9 s | 8.70 d | 0.001% | Rubber Stopper Vacuum Evac |
| Chemiluminescence CLIA Automated Reagent Pack | 6,200 packs per day | 2 | 8.7 s | 8.70 d | 0.007% | Snap Cartridge Heat Welding |
| Point-of-Care Blood Gas & Lactate Cartridge | 18,000 units per day | 3 | 4.5 s | 8.70 d | 0.002% | Laser Channel Seal Weld |
| 96-Well Streptavidin Pre-Coated ELISA Plate | 8,500 units per day | 2 | 6.4 s | 8.70 d | 0.005% | BSA Blocking & Vacuum Dry |
| Flocked Nasopharyngeal Swab & Liquid Amies | 42,000 units per day | 2 | 1.3 s | 8.70 d | 0.001% | Tube Amies Media Fill & Cap |
| Fluorescent Sensor Aerobic Blood Culture Bottle | 16,000 vials per day | 3 | 5.1 s | 8.70 d | 0.003% | CO2/N2 Atmosphere Crimp |
| Newborn Metabolic Screening Filter Paper Card | 28,000 units per day | 2 | 1.9 s | 8.70 d | 0.002% | 5-Circle Die & Barcode Match |