Flocked Nasopharyngeal Swab & Liquid Amies
Product family: Sterile PCR Transport Tubes.
Flow: Nylon Flock Fibers → Injection Shaft Dip Adhesive → Electrostatic Flock Spray & Cure → Tube Amies Media Fill & Cap → Dual Swab + Tube Flowpack → Gamma Irradiation Release → Diagnostic Specimen Sites
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Injection Shaft Dip Adhesive | 1.2 s | 35 min | 94% | 98.1% | 42,000 | 63,000 (1.50 d) | 39,883 |
| 2. Electrostatic Flock Spray & Cure | 1.2 s | 25 min | 92% | 97.4% | 25,200 | 58,800 (1.40 d) | 38,457 |
| 3. Tube Amies Media Fill & Cap | 1.4 s | 40 min | 84% | 95.2% | 21,000 | 75,600 (1.80 d) | 28,103 |
| 4. Dual Swab + Tube Flowpack | 1.2 s | 15 min | 94% | 98.6% | 16,800 | 42,000 (1.00 d) | 39,970 |
| 5. Gamma Irradiation Release | 1.2 s | 10 min | 96% | 99.1% | 21,000 | 50,400 (1.20 d) | 41,860 |
Key figures
- Takt time
- 1.3 s
- Lead time
- 8.70 d
- Value-added time
- 6.2 s
- Process cycle efficiency (PCE)
- 0.001%
- Rolled throughput yield (RTY)
- 88.9%
- Customer demand per day
- 42,000 units
- Line capacity per day
- 28,103 units
- Bottleneck
- Tube Amies Media Fill & Cap
Reading the bottleneck
The bottleneck is "Tube Amies Media Fill & Cap": it can process 28,103 units per day against a demand of 42,000 units, so it falls short of demand by 33.1%. Once downtime and scrap are counted, its cycle time grows from 1.4 s to 1.8 s, against a takt of 1.3 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.3 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of In-Vitro Diagnostics (IVD) & Kits: In-Vitro Diagnostics (IVD) & Kits
- Rapid Antigen / Cardiac Lateral Flow Strip Line
- Sample-to-Answer Microfluidic qPCR Cartridge
- Gold-Electrode Reel-to-Reel Glucose Test Strip
- CMOS Nano-Well DNA Sequencing Flow Cell
- Positive-Charged Silane Pathology Glass Slide
- Vacuum PET Blood Collection EDTA Tube Line
- Chemiluminescence CLIA Automated Reagent Pack
- Point-of-Care Blood Gas & Lactate Cartridge
- 96-Well Streptavidin Pre-Coated ELISA Plate
- Fluorescent Sensor Aerobic Blood Culture Bottle
- Newborn Metabolic Screening Filter Paper Card