Positive-Charged Silane Pathology Glass Slide
Product family: IHC Autostainer Barcoded Slides.
Flow: Low-Iron Glass Supplier → CNC Bevel Edge & Clean Rinse → APES Silane Charge Dip Coat → Ceramic Thermal Tab Print → 100-Slide Cleanroom Vision → Vacuum Desiccant Box Pack → Hospital Pathology Labs
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. CNC Bevel Edge & Clean Rinse | 1.2 s | 35 min | 94% | 98.1% | 45,000 | 67,500 (1.50 d) | 39,883 |
| 2. APES Silane Charge Dip Coat | 1.2 s | 25 min | 92% | 97.4% | 27,000 | 63,000 (1.40 d) | 38,457 |
| 3. Ceramic Thermal Tab Print | 1.3 s | 40 min | 84% | 95.2% | 22,500 | 81,000 (1.80 d) | 30,265 |
| 4. 100-Slide Cleanroom Vision | 1.2 s | 15 min | 94% | 98.6% | 18,000 | 45,000 (1.00 d) | 39,970 |
| 5. Vacuum Desiccant Box Pack | 1.2 s | 10 min | 96% | 99.1% | 22,500 | 54,000 (1.20 d) | 41,860 |
Key figures
- Takt time
- 1.2 s
- Lead time
- 8.70 d
- Value-added time
- 6.1 s
- Process cycle efficiency (PCE)
- 0.001%
- Rolled throughput yield (RTY)
- 88.9%
- Customer demand per day
- 45,000 samples
- Line capacity per day
- 30,265 samples
- Bottleneck
- Ceramic Thermal Tab Print
Reading the bottleneck
The bottleneck is "Ceramic Thermal Tab Print": it can process 30,265 samples per day against a demand of 45,000 samples, so it falls short of demand by 32.7%. Once downtime and scrap are counted, its cycle time grows from 1.3 s to 1.6 s, against a takt of 1.2 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.2 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of In-Vitro Diagnostics (IVD) & Kits: In-Vitro Diagnostics (IVD) & Kits
- Rapid Antigen / Cardiac Lateral Flow Strip Line
- Sample-to-Answer Microfluidic qPCR Cartridge
- Gold-Electrode Reel-to-Reel Glucose Test Strip
- CMOS Nano-Well DNA Sequencing Flow Cell
- Vacuum PET Blood Collection EDTA Tube Line
- Chemiluminescence CLIA Automated Reagent Pack
- Point-of-Care Blood Gas & Lactate Cartridge
- 96-Well Streptavidin Pre-Coated ELISA Plate
- Flocked Nasopharyngeal Swab & Liquid Amies
- Fluorescent Sensor Aerobic Blood Culture Bottle
- Newborn Metabolic Screening Filter Paper Card