Newborn Metabolic Screening Filter Paper Card
Product family: FDA-Cleared Dried Blood Cards.
Flow: Cotton Filter Paper Supplier → 903 Paper Humidity Equil → Offset Demographic Track Print → 5-Circle Die & Barcode Match → Absorption Time & pH Lot Audit → Clean Shrink Stack Pack → Maternity Wards & Labs
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. 903 Paper Humidity Equil | 1.3 s | 35 min | 94% | 98.1% | 28,000 | 42,000 (1.50 d) | 36,815 |
| 2. Offset Demographic Track Print | 1.6 s | 25 min | 92% | 97.4% | 16,800 | 39,200 (1.40 d) | 28,843 |
| 3. 5-Circle Die & Barcode Match | 2.1 s | 40 min | 84% | 95.2% | 14,000 | 50,400 (1.80 d) | 18,735 |
| 4. Absorption Time & pH Lot Audit | 1.4 s | 15 min | 94% | 98.6% | 11,200 | 28,000 (1.00 d) | 34,260 |
| 5. Clean Shrink Stack Pack | 1.2 s | 10 min | 96% | 99.1% | 14,000 | 33,600 (1.20 d) | 41,860 |
Key figures
- Takt time
- 1.9 s
- Lead time
- 8.70 d
- Value-added time
- 7.6 s
- Process cycle efficiency (PCE)
- 0.002%
- Rolled throughput yield (RTY)
- 88.9%
- Customer demand per day
- 28,000 units
- Line capacity per day
- 18,735 units
- Bottleneck
- 5-Circle Die & Barcode Match
Reading the bottleneck
The bottleneck is "5-Circle Die & Barcode Match": it can process 18,735 units per day against a demand of 28,000 units, so it falls short of demand by 33.1%. Once downtime and scrap are counted, its cycle time grows from 2.1 s to 2.6 s, against a takt of 1.9 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.4 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of In-Vitro Diagnostics (IVD) & Kits: In-Vitro Diagnostics (IVD) & Kits
- Rapid Antigen / Cardiac Lateral Flow Strip Line
- Sample-to-Answer Microfluidic qPCR Cartridge
- Gold-Electrode Reel-to-Reel Glucose Test Strip
- CMOS Nano-Well DNA Sequencing Flow Cell
- Positive-Charged Silane Pathology Glass Slide
- Vacuum PET Blood Collection EDTA Tube Line
- Chemiluminescence CLIA Automated Reagent Pack
- Point-of-Care Blood Gas & Lactate Cartridge
- 96-Well Streptavidin Pre-Coated ELISA Plate
- Flocked Nasopharyngeal Swab & Liquid Amies
- Fluorescent Sensor Aerobic Blood Culture Bottle