Fluorescent Sensor Aerobic Blood Culture Bottle
Product family: Sepsis Microbial Growth Vials.
Flow: Tryptic Soy Broth & CO2 Sensor → pH/CO2 Sensor Polymer Drop → Broth Dissolve & Bottle Fill → CO2/N2 Atmosphere Crimp → Autoclave Terminal Cycle → Fluorescence Base Scan & Box → Hospital Bacteriology Labs
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. pH/CO2 Sensor Polymer Drop | 3.4 s | 35 min | 94% | 98.1% | 16,000 | 24,000 (1.50 d) | 21,399 |
| 2. Broth Dissolve & Bottle Fill | 4.2 s | 25 min | 92% | 97.4% | 9,600 | 22,400 (1.40 d) | 16,748 |
| 3. CO2/N2 Atmosphere Crimp | 5.4 s | 40 min | 84% | 95.2% | 8,000 | 28,800 (1.80 d) | 11,284 |
| 4. Autoclave Terminal Cycle | 3.7 s | 15 min | 94% | 98.6% | 6,400 | 16,000 (1.00 d) | 19,727 |
| 5. Fluorescence Base Scan & Box | 3.0 s | 10 min | 96% | 99.1% | 8,000 | 19,200 (1.20 d) | 25,306 |
Key figures
- Takt time
- 5.1 s
- Lead time
- 8.70 d
- Value-added time
- 19.7 s
- Process cycle efficiency (PCE)
- 0.003%
- Rolled throughput yield (RTY)
- 88.9%
- Customer demand per day
- 16,000 vials
- Line capacity per day
- 11,284 vials
- Bottleneck
- CO2/N2 Atmosphere Crimp
Reading the bottleneck
The bottleneck is "CO2/N2 Atmosphere Crimp": it can process 11,284 vials per day against a demand of 16,000 vials, so it falls short of demand by 29.5%. Once downtime and scrap are counted, its cycle time grows from 5.4 s to 6.8 s, against a takt of 5.1 s. The largest loss at this step is equipment downtime (uptime 84%), about 1.0 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of In-Vitro Diagnostics (IVD) & Kits: In-Vitro Diagnostics (IVD) & Kits
- Rapid Antigen / Cardiac Lateral Flow Strip Line
- Sample-to-Answer Microfluidic qPCR Cartridge
- Gold-Electrode Reel-to-Reel Glucose Test Strip
- CMOS Nano-Well DNA Sequencing Flow Cell
- Positive-Charged Silane Pathology Glass Slide
- Vacuum PET Blood Collection EDTA Tube Line
- Chemiluminescence CLIA Automated Reagent Pack
- Point-of-Care Blood Gas & Lactate Cartridge
- 96-Well Streptavidin Pre-Coated ELISA Plate
- Flocked Nasopharyngeal Swab & Liquid Amies
- Newborn Metabolic Screening Filter Paper Card