Point-of-Care Blood Gas & Lactate Cartridge

Product family: Single-Drop ICU Bedside Cards.

Flow: Cyclic Olefin & Biosensors → Thin-Film Electrode Screen → Calibrant Foil Blister Insert → Laser Channel Seal Weld → Vacuum Foil Card Bagging → Lot Wet-Chemistry Release → ICU & Emergency Rooms

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Point-of-Care Blood Gas & Lactate CartridgeSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Cyclic Olefin & Biosensors → Thin-Film Electrode Screen (3.1 s) → Calibrant Foil Blister Insert (3.7 s) → Laser Channel Seal Weld (4.8 s) → Vacuum Foil Card Bagging (3.3 s) → Lot Wet-Chemistry Release (2.7 s) → ICU & Emergency Rooms.SUPPLIERCyclic Olefin &BiosensorsI1.50 d1Thin-FilmElectrode ScreenC/T 3.1 sI1.40 d2Calibrant FoilBlister InsertC/T 3.7 sI1.80 d3Laser ChannelSeal WeldC/T 4.8 sI1.00 d4Vacuum Foil CardBaggingC/T 3.3 sI1.20 d5Lot Wet-ChemistryReleaseC/T 2.7 sI1.80 dCUSTOMERICU & EmergencyRooms18,000 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Thin-Film Electrode Screen3.1 s35 min94%98.1%18,00027,000 (1.50 d)23,470
2. Calibrant Foil Blister Insert3.7 s25 min92%97.4%10,80025,200 (1.40 d)19,011
3. Laser Channel Seal Weld4.8 s40 min84%95.2%9,00032,400 (1.80 d)12,695
4. Vacuum Foil Card Bagging3.3 s15 min94%98.6%7,20018,000 (1.00 d)22,118
5. Lot Wet-Chemistry Release2.7 s10 min96%99.1%9,00021,600 (1.20 d)28,118

Key figures

Takt time
4.5 s
Lead time
8.70 d
Value-added time
17.6 s
Process cycle efficiency (PCE)
0.002%
Rolled throughput yield (RTY)
88.9%
Customer demand per day
18,000 units
Line capacity per day
12,695 units
Bottleneck
Laser Channel Seal Weld

Reading the bottleneck

The bottleneck is "Laser Channel Seal Weld": it can process 12,695 units per day against a demand of 18,000 units, so it falls short of demand by 29.5%. Once downtime and scrap are counted, its cycle time grows from 4.8 s to 6.0 s, against a takt of 4.5 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.9 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.