Chemiluminescence CLIA Automated Reagent Pack

Product family: Magnetic Particle Assay Carts.

Flow: Magnetic Beads → Cold Bead Buffer Formulation → Dual-Nozzle Aseptic Bottle Fill → Snap Cartridge Heat Welding → RFID Lot Calibration Tag Write → Analyzer Blind Panel Release → Hospital Core Analyzers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Chemiluminescence CLIA Automated Reagent PackSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Magnetic Beads → Cold Bead Buffer Formulation (5.9 s) → Dual-Nozzle Aseptic Bottle Fill (7.1 s) → Snap Cartridge Heat Welding (9.3 s) → RFID Lot Calibration Tag Write (6.4 s) → Analyzer Blind Panel Release (5.2 s) → Hospital Core Analyzers.SUPPLIERMagnetic BeadsI1.50 d1Cold Bead BufferFormulationC/T 5.9 sI1.40 d2Dual-NozzleAseptic Bottle…C/T 7.1 sI1.80 d3Snap CartridgeHeat WeldingC/T 9.3 sI1.00 d4RFID LotCalibration Tag…C/T 6.4 sI1.20 d5Analyzer BlindPanel ReleaseC/T 5.2 sI1.80 dCUSTOMERHospital CoreAnalyzers6,200 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Cold Bead Buffer Formulation5.9 s35 min94%98.1%6,2009,300 (1.50 d)8,112
2. Dual-Nozzle Aseptic Bottle Fill7.1 s25 min92%97.4%3,7208,680 (1.40 d)6,500
3. Snap Cartridge Heat Welding9.3 s40 min84%95.2%3,10011,160 (1.80 d)4,231
4. RFID Lot Calibration Tag Write6.4 s15 min94%98.6%2,4806,200 (1.00 d)7,494
5. Analyzer Blind Panel Release5.2 s10 min96%99.1%3,1007,440 (1.20 d)9,660

Key figures

Takt time
8.7 s
Lead time
8.70 d
Value-added time
33.9 s
Process cycle efficiency (PCE)
0.007%
Rolled throughput yield (RTY)
88.9%
Customer demand per day
6,200 packs
Line capacity per day
4,231 packs
Bottleneck
Snap Cartridge Heat Welding

Reading the bottleneck

The bottleneck is "Snap Cartridge Heat Welding": it can process 4,231 packs per day against a demand of 6,200 packs, so it falls short of demand by 31.8%. Once downtime and scrap are counted, its cycle time grows from 9.3 s to 11.6 s, against a takt of 8.7 s. The largest loss at this step is equipment downtime (uptime 84%), about 1.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of In-Vitro Diagnostics (IVD) & Kits: In-Vitro Diagnostics (IVD) & Kits