96-Well Streptavidin Pre-Coated ELISA Plate
Product family: Diagnostic Microtiter Plates.
Flow: Virgin High-Bind Polystyrene → Optically Clear Polystyrene Mold → Automated 96-Channel Dispense → BSA Blocking & Vacuum Dry → Foil Bag Desiccant Heat Seal → CV <4% Optical Uniformity → Pharma & Research Labs
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Optically Clear Polystyrene Mold | 4.3 s | 35 min | 94% | 98.1% | 8,500 | 12,750 (1.50 d) | 11,130 |
| 2. Automated 96-Channel Dispense | 5.2 s | 25 min | 92% | 97.4% | 5,100 | 11,900 (1.40 d) | 8,875 |
| 3. BSA Blocking & Vacuum Dry | 6.8 s | 40 min | 84% | 95.2% | 4,250 | 15,300 (1.80 d) | 5,786 |
| 4. Foil Bag Desiccant Heat Seal | 4.7 s | 15 min | 94% | 98.6% | 3,400 | 8,500 (1.00 d) | 10,205 |
| 5. CV <4% Optical Uniformity | 3.8 s | 10 min | 96% | 99.1% | 4,250 | 10,200 (1.20 d) | 13,219 |
Key figures
- Takt time
- 6.4 s
- Lead time
- 8.70 d
- Value-added time
- 24.8 s
- Process cycle efficiency (PCE)
- 0.005%
- Rolled throughput yield (RTY)
- 88.9%
- Customer demand per day
- 8,500 units
- Line capacity per day
- 5,786 units
- Bottleneck
- BSA Blocking & Vacuum Dry
Reading the bottleneck
The bottleneck is "BSA Blocking & Vacuum Dry": it can process 5,786 units per day against a demand of 8,500 units, so it falls short of demand by 31.9%. Once downtime and scrap are counted, its cycle time grows from 6.8 s to 8.5 s, against a takt of 6.4 s. The largest loss at this step is equipment downtime (uptime 84%), about 1.3 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of In-Vitro Diagnostics (IVD) & Kits: In-Vitro Diagnostics (IVD) & Kits
- Rapid Antigen / Cardiac Lateral Flow Strip Line
- Sample-to-Answer Microfluidic qPCR Cartridge
- Gold-Electrode Reel-to-Reel Glucose Test Strip
- CMOS Nano-Well DNA Sequencing Flow Cell
- Positive-Charged Silane Pathology Glass Slide
- Vacuum PET Blood Collection EDTA Tube Line
- Chemiluminescence CLIA Automated Reagent Pack
- Point-of-Care Blood Gas & Lactate Cartridge
- Flocked Nasopharyngeal Swab & Liquid Amies
- Fluorescent Sensor Aerobic Blood Culture Bottle
- Newborn Metabolic Screening Filter Paper Card