Oral Solid Dose, Tablets & Blister VSM Scenarios
12 scenarios of Oral Solid Dose, Tablets & Blister, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Dispensing & Fluid-Bed Granule → Rotary Tablet Compression → Film Coating & Print Pan → ALU-PVC Blister Thermoform → Cartoner, FMD & Batch Release. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| High-Shear Granulation & Film-Coated Tablet | 240,000 units per day | 3 | 0.3 s | 9.90 d | 0.001% | 90-Station Rotary Compression |
| High-Speed ALU-ALU Tropicalized Blister Line | 36,000 packs per day | 2 | 1.5 s | 9.90 d | 0.001% | Vision Missing/Broken Camera |
| Enteric Pellet Hard-Gelatin Capsule Filling | 180,000 units per day | 2 | 0.3 s | 9.90 d | 0.001% | 120k/hr Dosing Disc Encapsule |
| RH<12% Low-Humidity Effervescent Tube Line | 120,000 units per day | 2 | 0.5 s | 9.90 d | 0.001% | Stack-Count Tube Drop & Cap |
| Oral Suspension Syrup & Child-Safe Cap Line | 16,000 vials per day | 2 | 3.4 s | 9.90 d | 0.003% | CRC Child-Resistant Cap Seal |
| OEB-5 High-Potency Contained Oncology Tablet | 14,000 units per day | 2 | 3.9 s | 9.90 d | 0.003% | Contained Rotary Tablet Press |
| Rotary Die Liquid-Fill Softgel Vitamin Line | 210,000 units per day | 3 | 0.4 s | 9.90 d | 0.001% | Tumble & 36h Tunnel Drying |
| 4-Lane Aluminum Foil Stick-Pack Powder Line | 95,000 packs per day | 2 | 0.6 s | 9.90 d | 0.001% | Ultrasonic Tear-Notch Seal |
| Thin-Film Orally Disintegrating Strip Line | 48,000 units per day | 2 | 1.1 s | 9.90 d | 0.001% | Master Roll Precision Slit |
| Dual-Release Fixed-Dose Bilayer Tablet | 110,000 units per day | 2 | 0.5 s | 9.90 d | 0.001% | Layer 2 Feed & Main Tamp |
| Randomized Double-Blind Clinical Trial Kit Pack | 850 packs per day | 1 | 31.8 s | 9.90 d | 0.048% | Tamper Wallet Blister Pack |
| Continuous Melt-Pour Suppository PVC Shell | 64,000 units per day | 2 | 0.8 s | 9.90 d | 0.001% | Recirculating Heated Volumetric |