Continuous Melt-Pour Suppository PVC Shell

Product family: Pediatric Antipyretic Suppositories.

Flow: Hard Fat Base Supplier → Jacketed Lipid Melt Suspend → Thermoform Torpedo PVC Shell → Recirculating Heated Volumetric → Cold Cooling Tunnel Solidify → Top Heat-Seal & Perforate → European & MENA Pharmacies

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Continuous Melt-Pour Suppository PVC ShellSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Hard Fat Base Supplier → Jacketed Lipid Melt Suspend (1.2 s) → Thermoform Torpedo PVC Shell (1.2 s) → Recirculating Heated Volumetric (1.2 s) → Cold Cooling Tunnel Solidify (1.2 s) → Top Heat-Seal & Perforate (1.2 s) → European & MENA Pharmacies.SUPPLIERHard Fat BaseSupplierI1.60 d1Jacketed LipidMelt SuspendC/T 1.2 sI1.80 d2ThermoformTorpedo PVC ShellC/T 1.2 sI2.10 d3RecirculatingHeated VolumetricC/T 1.2 sI1.20 d4Cold CoolingTunnel SolidifyC/T 1.2 sI1.40 d5Top Heat-Seal &PerforateC/T 1.2 sI1.80 dCUSTOMEREuropean & MENAPharmacies64,000 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Jacketed Lipid Melt Suspend1.2 s45 min94%99.1%96,000102,400 (1.60 d)40,522
2. Thermoform Torpedo PVC Shell1.2 s75 min89%97.6%96,000115,200 (1.80 d)36,917
3. Recirculating Heated Volumetric1.2 s65 min84%96.1%96,000134,400 (2.10 d)34,577
4. Cold Cooling Tunnel Solidify1.2 s35 min91%98.2%51,20076,800 (1.20 d)38,258
5. Top Heat-Seal & Perforate1.2 s15 min95%99.4%32,00089,600 (1.40 d)41,077

Key figures

Takt time
0.8 s
Lead time
9.90 d
Value-added time
6.0 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
90.7%
Customer demand per day
64,000 units
Line capacity per day
34,577 units
Bottleneck
Recirculating Heated Volumetric

Reading the bottleneck

The bottleneck is "Recirculating Heated Volumetric": it can process 34,577 units per day against a demand of 64,000 units, so it falls short of demand by 46.0%. Once downtime and scrap are counted, its cycle time grows from 1.2 s to 1.5 s, against a takt of 0.8 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.