Enteric Pellet Hard-Gelatin Capsule Filling
Product family: Delayed-Release PPI Capsules.
Flow: Empty-capsule manufacturer → Sugar Sphere Drug Layering → Wurster Enteric Polymer Coat → 120k/hr Dosing Disc Encapsule → Polishing & Checkweigh Sort → HDPE Bottle Desiccant & Cap → Global Pharma Distributors
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Sugar Sphere Drug Layering | 1.2 s | 45 min | 94% | 99.1% | 270,000 | 288,000 (1.60 d) | 40,522 |
| 2. Wurster Enteric Polymer Coat | 1.2 s | 75 min | 89% | 97.6% | 270,000 | 324,000 (1.80 d) | 36,917 |
| 3. 120k/hr Dosing Disc Encapsule | 1.2 s | 65 min | 84% | 96.1% | 270,000 | 378,000 (2.10 d) | 34,577 |
| 4. Polishing & Checkweigh Sort | 1.2 s | 35 min | 91% | 98.2% | 144,000 | 216,000 (1.20 d) | 38,258 |
| 5. HDPE Bottle Desiccant & Cap | 1.2 s | 15 min | 95% | 99.4% | 90,000 | 252,000 (1.40 d) | 41,077 |
Key figures
- Takt time
- 0.3 s
- Lead time
- 9.90 d
- Value-added time
- 6.0 s
- Process cycle efficiency (PCE)
- 0.001%
- Rolled throughput yield (RTY)
- 90.7%
- Customer demand per day
- 180,000 units
- Line capacity per day
- 34,577 units
- Bottleneck
- 120k/hr Dosing Disc Encapsule
Reading the bottleneck
The bottleneck is "120k/hr Dosing Disc Encapsule": it can process 34,577 units per day against a demand of 180,000 units, so it falls short of demand by 80.8%. Once downtime and scrap are counted, its cycle time grows from 1.2 s to 1.5 s, against a takt of 0.3 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.2 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Oral Solid Dose, Tablets & Blister: Oral Solid Dose, Tablets & Blister
- High-Shear Granulation & Film-Coated Tablet
- High-Speed ALU-ALU Tropicalized Blister Line
- RH<12% Low-Humidity Effervescent Tube Line
- Oral Suspension Syrup & Child-Safe Cap Line
- OEB-5 High-Potency Contained Oncology Tablet
- Rotary Die Liquid-Fill Softgel Vitamin Line
- 4-Lane Aluminum Foil Stick-Pack Powder Line
- Thin-Film Orally Disintegrating Strip Line
- Dual-Release Fixed-Dose Bilayer Tablet
- Randomized Double-Blind Clinical Trial Kit Pack
- Continuous Melt-Pour Suppository PVC Shell