Thin-Film Orally Disintegrating Strip Line

Product family: Rapid-Onset Sublingual Strips.

Flow: Pullulan HPMC Supplier → Active Polymer Slot-Die Coat → Controlled Air Impingement Dry → Master Roll Precision Slit → Single Strip Die & Foil Pouch → Water Content & Tensile Audit → Specialty CNS Pharma

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Thin-Film Orally Disintegrating Strip LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Pullulan HPMC Supplier → Active Polymer Slot-Die Coat (1.2 s) → Controlled Air Impingement Dry (1.2 s) → Master Roll Precision Slit (1.2 s) → Single Strip Die & Foil Pouch (1.2 s) → Water Content & Tensile Audit (1.2 s) → Specialty CNS Pharma.SUPPLIERPullulan HPMCSupplierI1.60 d1Active PolymerSlot-Die CoatC/T 1.2 sI1.80 d2Controlled AirImpingement DryC/T 1.2 sI2.10 d3Master RollPrecision SlitC/T 1.2 sI1.20 d4Single Strip Die& Foil PouchC/T 1.2 sI1.40 d5Water Content &Tensile AuditC/T 1.2 sI1.80 dCUSTOMERSpecialty CNSPharma48,000 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Active Polymer Slot-Die Coat1.2 s45 min94%99.1%72,00076,800 (1.60 d)40,522
2. Controlled Air Impingement Dry1.2 s75 min89%97.6%72,00086,400 (1.80 d)36,917
3. Master Roll Precision Slit1.2 s65 min84%96.1%72,000100,800 (2.10 d)34,577
4. Single Strip Die & Foil Pouch1.2 s35 min91%98.2%38,40057,600 (1.20 d)38,258
5. Water Content & Tensile Audit1.2 s15 min95%99.4%24,00067,200 (1.40 d)41,077

Key figures

Takt time
1.1 s
Lead time
9.90 d
Value-added time
6.0 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
90.7%
Customer demand per day
48,000 units
Line capacity per day
34,577 units
Bottleneck
Master Roll Precision Slit

Reading the bottleneck

The bottleneck is "Master Roll Precision Slit": it can process 34,577 units per day against a demand of 48,000 units, so it falls short of demand by 28.0%. Once downtime and scrap are counted, its cycle time grows from 1.2 s to 1.5 s, against a takt of 1.1 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.