Sawmills, Timber, CLT & Wood Panels VSM Scenarios

12 scenarios of Sawmills, Timber, CLT & Wood Panels, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.

Shared steps

All 12 scenarios follow the same flow, from supplier to customer: Debark, 3D Scan & Primary Saw → Finger-Joint & Planing Mill → Steam Kiln Dry / Hot Press CLT → 5-Axis CNC Timber Joinery → Grade Stamp & Strapped Bundle. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.

Scenario comparison

Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.

ScenarioDemandShiftsTaktLead timePCEBottleneck
High-Speed Chipper-Canter Structural Sawmill420 tonnes per day3193 s10.4 d0.088%Auto Sticker-Stacker Frame
Mass-Timber Cross-Laminated Timber (CLT) Press28 parts per day21,929 s10.5 d1.3%Cross-Lay PUR Glue Vacuum Press
Continuous Medium Density Fiberboard550 tonnes per day3147 s10.4 d0.067%Forming Station Scalping Roll
OSB/3 Oriented Strand Structural Sheathing Line620 tonnes per day3131 s10.4 d0.060%Cross-Oriented Face/Core Mat
High-Speed Automated EUR EPAL Pallet Nailing4,800 units per day211.3 s10.4 d0.008%Corner Chamfer & Brand Stamp
225L Bordeaux Toasted French Oak Wine Barrel140 units per day1193 s10.4 d0.26%Precision Controlled Flame Toast
Curved Glued-Laminated Roof Span Arch Beam22 parts per day22,455 s10.6 d1.7%Custom Curved Jig Clamping
13-Ply Marine Film-Faced Concrete Form Plywood950 parts per day385.3 s10.4 d0.039%Jet Veneer Dryer & Patching
ENplus-A1 White Wood Biofuel Heating Pellets280 tonnes per day3289 s10.4 d0.13%Ring-Die Extrusion Pellet Mill
2.8m Heavy Treated Timber Power Cable Drum110 units per day2491 s10.4 d0.34%Stave Lagging & Tie-Rod Torque
Micro-Agglomerated TCA-Free Wine Cork Stopper95,000 units per day20.6 s10.4 d0.001%Individual Mold Cure Reaction
Carbonized High-Density Thermo-Bamboo Decking680 parts per day279.4 s10.4 d0.054%2500T High-Density Hot Press