High-Speed Automated EUR EPAL Pallet Nailing

Product family: 1200x800mm Heat-Treated EPAL.

Flow: Pine Pallet Deck Boards → Multiple Crosscut Deck & Block → Twin-Tandem Hydraulic Nailing → Corner Chamfer & Brand Stamp → ISPM-15 56°C Heat Chamber → Nest-Stack 18-High Bundle → FMCG & 3PL Pooling Depots

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: High-Speed Automated EUR EPAL Pallet NailingSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Pine Pallet Deck Boards → Multiple Crosscut Deck & Block (7.4 s) → Twin-Tandem Hydraulic Nailing (9.2 s) → Corner Chamfer & Brand Stamp (12.2 s) → ISPM-15 56°C Heat Chamber (8.3 s) → Nest-Stack 18-High Bundle (6.3 s) → FMCG & 3PL Pooling Depots.SUPPLIERPine PalletDeck BoardsI1.80 d1Multiple CrosscutDeck & BlockC/T 7.4 sI1.60 d2Twin-TandemHydraulic NailingC/T 9.2 sI2.80 d3Corner Chamfer &Brand StampC/T 12.2 sI1.20 d4ISPM-15 56°C HeatChamberC/T 8.3 sI1.00 d5Nest-Stack18-High BundleC/T 6.3 sI2.00 dCUSTOMERFMCG & 3PLPooling Depots4,800 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Multiple Crosscut Deck & Block7.4 s20 min94%98.4%7,2008,640 (1.80 d)6,650
2. Twin-Tandem Hydraulic Nailing9.2 s25 min91%97.6%4,8007,680 (1.60 d)5,068
3. Corner Chamfer & Brand Stamp12.2 s45 min84%95.8%7,20013,440 (2.80 d)3,443
4. ISPM-15 56°C Heat Chamber8.3 s20 min93%98.2%2,4005,760 (1.20 d)5,678
5. Nest-Stack 18-High Bundle6.3 s8 min97%99.4%1,9204,800 (1.00 d)8,081

Key figures

Takt time
11.3 s
Lead time
10.4 d
Value-added time
43.4 s
Process cycle efficiency (PCE)
0.008%
Rolled throughput yield (RTY)
89.8%
Customer demand per day
4,800 units
Line capacity per day
3,443 units
Bottleneck
Corner Chamfer & Brand Stamp

Reading the bottleneck

The bottleneck is "Corner Chamfer & Brand Stamp": it can process 3,443 units per day against a demand of 4,800 units, so it falls short of demand by 28.3%. Once downtime and scrap are counted, its cycle time grows from 12.2 s to 15.2 s, against a takt of 11.3 s. The largest loss at this step is equipment downtime (uptime 84%), about 2.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.