OSB/3 Oriented Strand Structural Sheathing Line
Product family: Moisture-Resistant Roof Panels.
Flow: Small-Diameter Pine Logs → Long-Knife Ring Flaker Stand → 3-Layer Drum Dryer & Blend → Cross-Oriented Face/Core Mat → Continuous Press Steam Injection → Tongue & Groove Edge Seal → Timber Frame & Packaging
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Long-Knife Ring Flaker Stand | 86.0 s | 20 min | 94% | 98.4% | 930 | 1,116 (1.80 d) | 863 |
| 2. 3-Layer Drum Dryer & Blend | 107 s | 25 min | 91% | 97.6% | 620 | 992 (1.60 d) | 660 |
| 3. Cross-Oriented Face/Core Mat | 141 s | 45 min | 84% | 95.8% | 930 | 1,736 (2.80 d) | 452 |
| 4. Continuous Press Steam Injection | 97.0 s | 20 min | 93% | 98.2% | 310 | 744 (1.20 d) | 740 |
| 5. Tongue & Groove Edge Seal | 73.0 s | 8 min | 97% | 99.4% | 248 | 620 (1.00 d) | 1,054 |
Key figures
- Takt time
- 131 s
- Lead time
- 10.4 d
- Value-added time
- 504 s
- Process cycle efficiency (PCE)
- 0.060%
- Rolled throughput yield (RTY)
- 89.8%
- Customer demand per day
- 620 tonnes
- Line capacity per day
- 452 tonnes
- Bottleneck
- Cross-Oriented Face/Core Mat
Reading the bottleneck
The bottleneck is "Cross-Oriented Face/Core Mat": it can process 452 tonnes per day against a demand of 620 tonnes, so it falls short of demand by 27.1%. Once downtime and scrap are counted, its cycle time grows from 141 s to 175 s, against a takt of 131 s. The largest loss at this step is equipment downtime (uptime 84%), about 26.9 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Sawmills, Timber, CLT & Wood Panels: Sawmills, Timber, CLT & Wood Panels
- High-Speed Chipper-Canter Structural Sawmill
- Mass-Timber Cross-Laminated Timber (CLT) Press
- Continuous Medium Density Fiberboard
- High-Speed Automated EUR EPAL Pallet Nailing
- 225L Bordeaux Toasted French Oak Wine Barrel
- Curved Glued-Laminated Roof Span Arch Beam
- 13-Ply Marine Film-Faced Concrete Form Plywood
- ENplus-A1 White Wood Biofuel Heating Pellets
- 2.8m Heavy Treated Timber Power Cable Drum
- Micro-Agglomerated TCA-Free Wine Cork Stopper
- Carbonized High-Density Thermo-Bamboo Decking