13-Ply Marine Film-Faced Concrete Form Plywood

Product family: Phenolic WBP Structural Sheets.

Flow: Siberian / Nordic Birch Logs → Hydrothermal Conditioning Soak → X-Y Laser Spindleless Peeler → Jet Veneer Dryer & Patching → Cross-Grain Glue & Multi-Day Press → Acrylic Edge Seal & Grade Stack → Concrete Formwork Renters

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 13-Ply Marine Film-Faced Concrete Form PlywoodSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Siberian / Nordic Birch Logs → Hydrothermal Conditioning Soak (56.0 s) → X-Y Laser Spindleless Peeler (70.0 s) → Jet Veneer Dryer & Patching (92.0 s) → Cross-Grain Glue & Multi-Day Press (63.0 s) → Acrylic Edge Seal & Grade Stack (48.0 s) → Concrete Formwork Renters.SUPPLIERSiberian /Nordic BirchLogsI1.80 d1HydrothermalConditioning SoakC/T 56.0 sI1.60 d2X-Y LaserSpindleless…C/T 70.0 sI2.80 d3Jet Veneer Dryer& PatchingC/T 92.0 sI1.20 d4Cross-Grain Glue& Multi-Day PressC/T 63.0 sI1.00 d5Acrylic Edge Seal& Grade StackC/T 48.0 sI2.00 dCUSTOMERConcreteFormwork…950 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Hydrothermal Conditioning Soak56.0 s20 min94%98.4%1,4251,710 (1.80 d)1,325
2. X-Y Laser Spindleless Peeler70.0 s25 min91%97.6%9501,520 (1.60 d)1,009
3. Jet Veneer Dryer & Patching92.0 s45 min84%95.8%1,4252,660 (2.80 d)693
4. Cross-Grain Glue & Multi-Day Press63.0 s20 min93%98.2%4751,140 (1.20 d)1,139
5. Acrylic Edge Seal & Grade Stack48.0 s8 min97%99.4%380950 (1.00 d)1,603

Key figures

Takt time
85.3 s
Lead time
10.4 d
Value-added time
329 s
Process cycle efficiency (PCE)
0.039%
Rolled throughput yield (RTY)
89.8%
Customer demand per day
950 parts
Line capacity per day
693 parts
Bottleneck
Jet Veneer Dryer & Patching

Reading the bottleneck

The bottleneck is "Jet Veneer Dryer & Patching": it can process 693 parts per day against a demand of 950 parts, so it falls short of demand by 27.1%. Once downtime and scrap are counted, its cycle time grows from 92.0 s to 114 s, against a takt of 85.3 s. The largest loss at this step is equipment downtime (uptime 84%), about 17.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Sawmills, Timber, CLT & Wood Panels: Sawmills, Timber, CLT & Wood Panels