Curved Glued-Laminated Roof Span Arch Beam
Product family: 30m Long-Span GL28h Beams.
Flow: Lamella C24 Nordic Spruce → Visual & Ultrasonic Grade → High-Frequency Finger Joint → Custom Curved Jig Clamping → Mega-Planer & Steel Flitch Cut → Wax End Seal & Weather Wrap → Sports Arenas & Bridges
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Visual & Ultrasonic Grade | 1,620 s | 20 min | 94% | 98.4% | 33 | 40 (1.82 d) | 30 |
| 2. High-Frequency Finger Joint | 2,013 s | 25 min | 91% | 97.6% | 22 | 35 (1.59 d) | 23 |
| 3. Custom Curved Jig Clamping | 2,651 s | 45 min | 84% | 95.8% | 33 | 62 (2.82 d) | 16 |
| 4. Mega-Planer & Steel Flitch Cut | 1,816 s | 20 min | 93% | 98.2% | 11 | 26 (1.18 d) | 26 |
| 5. Wax End Seal & Weather Wrap | 1,375 s | 8 min | 97% | 99.4% | 9 | 22 (1.00 d) | 37 |
Key figures
- Takt time
- 2,455 s
- Lead time
- 10.6 d
- Value-added time
- 9,475 s
- Process cycle efficiency (PCE)
- 1.7%
- Rolled throughput yield (RTY)
- 89.8%
- Customer demand per day
- 22 parts
- Line capacity per day
- 16 parts
- Bottleneck
- Custom Curved Jig Clamping
Reading the bottleneck
The bottleneck is "Custom Curved Jig Clamping": it can process 16 parts per day against a demand of 22 parts, so it falls short of demand by 28.0%. Once downtime and scrap are counted, its cycle time grows from 2,651 s to 3,294 s, against a takt of 2,455 s. The largest loss at this step is equipment downtime (uptime 84%), about 505 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Sawmills, Timber, CLT & Wood Panels: Sawmills, Timber, CLT & Wood Panels
- High-Speed Chipper-Canter Structural Sawmill
- Mass-Timber Cross-Laminated Timber (CLT) Press
- Continuous Medium Density Fiberboard
- OSB/3 Oriented Strand Structural Sheathing Line
- High-Speed Automated EUR EPAL Pallet Nailing
- 225L Bordeaux Toasted French Oak Wine Barrel
- 13-Ply Marine Film-Faced Concrete Form Plywood
- ENplus-A1 White Wood Biofuel Heating Pellets
- 2.8m Heavy Treated Timber Power Cable Drum
- Micro-Agglomerated TCA-Free Wine Cork Stopper
- Carbonized High-Density Thermo-Bamboo Decking