Curved Glued-Laminated Roof Span Arch Beam

Product family: 30m Long-Span GL28h Beams.

Flow: Lamella C24 Nordic Spruce → Visual & Ultrasonic Grade → High-Frequency Finger Joint → Custom Curved Jig Clamping → Mega-Planer & Steel Flitch Cut → Wax End Seal & Weather Wrap → Sports Arenas & Bridges

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Curved Glued-Laminated Roof Span Arch BeamSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Lamella C24 Nordic Spruce → Visual & Ultrasonic Grade (1,620 s) → High-Frequency Finger Joint (2,013 s) → Custom Curved Jig Clamping (2,651 s) → Mega-Planer & Steel Flitch Cut (1,816 s) → Wax End Seal & Weather Wrap (1,375 s) → Sports Arenas & Bridges.SUPPLIERLamella C24Nordic SpruceI1.82 d1Visual &Ultrasonic GradeC/T 1,620 sI1.59 d2High-FrequencyFinger JointC/T 2,013 sI2.82 d3Custom Curved JigClampingC/T 2,651 sI1.18 d4Mega-Planer &Steel Flitch CutC/T 1,816 sI1.00 d5Wax End Seal &Weather WrapC/T 1,375 sI2.00 dCUSTOMERSports Arenas &Bridges22 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Visual & Ultrasonic Grade1,620 s20 min94%98.4%3340 (1.82 d)30
2. High-Frequency Finger Joint2,013 s25 min91%97.6%2235 (1.59 d)23
3. Custom Curved Jig Clamping2,651 s45 min84%95.8%3362 (2.82 d)16
4. Mega-Planer & Steel Flitch Cut1,816 s20 min93%98.2%1126 (1.18 d)26
5. Wax End Seal & Weather Wrap1,375 s8 min97%99.4%922 (1.00 d)37

Key figures

Takt time
2,455 s
Lead time
10.6 d
Value-added time
9,475 s
Process cycle efficiency (PCE)
1.7%
Rolled throughput yield (RTY)
89.8%
Customer demand per day
22 parts
Line capacity per day
16 parts
Bottleneck
Custom Curved Jig Clamping

Reading the bottleneck

The bottleneck is "Custom Curved Jig Clamping": it can process 16 parts per day against a demand of 22 parts, so it falls short of demand by 28.0%. Once downtime and scrap are counted, its cycle time grows from 2,651 s to 3,294 s, against a takt of 2,455 s. The largest loss at this step is equipment downtime (uptime 84%), about 505 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.