Mass-Timber Cross-Laminated Timber (CLT) Press

Product family: 16m Structural Floor Slabs.

Flow: C24 Spruce Finger-Jointed → Moisture & E-Modulus Machine → Twin-Face Finger Joint Cure → Cross-Lay PUR Glue Vacuum Press → 5-Axis Giant Portal Window Cut → Crane Lifting Eye & Moisture Tarps → Mass-Timber Multi-Story

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Mass-Timber Cross-Laminated Timber (CLT) PressSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. C24 Spruce Finger-Jointed → Moisture & E-Modulus Machine (1,273 s) → Twin-Face Finger Joint Cure (1,581 s) → Cross-Lay PUR Glue Vacuum Press (2,083 s) → 5-Axis Giant Portal Window Cut (1,427 s) → Crane Lifting Eye & Moisture Tarps (1,080 s) → Mass-Timber Multi-Story.SUPPLIERC24 SpruceFinger-JointedI1.79 d1Moisture &E-Modulus MachineC/T 1,273 sI1.61 d2Twin-Face FingerJoint CureC/T 1,581 sI2.79 d3Cross-Lay PURGlue Vacuum PressC/T 2,083 sI1.21 d45-Axis GiantPortal Window CutC/T 1,427 sI1.00 d5Crane Lifting Eye& Moisture TarpsC/T 1,080 sI2.00 dCUSTOMERMass-TimberMulti-Story28 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Moisture & E-Modulus Machine1,273 s20 min94%98.4%4250 (1.79 d)39
2. Twin-Face Finger Joint Cure1,581 s25 min91%97.6%2845 (1.61 d)29
3. Cross-Lay PUR Glue Vacuum Press2,083 s45 min84%95.8%4278 (2.79 d)20
4. 5-Axis Giant Portal Window Cut1,427 s20 min93%98.2%1434 (1.21 d)33
5. Crane Lifting Eye & Moisture Tarps1,080 s8 min97%99.4%1128 (1.00 d)47

Key figures

Takt time
1,929 s
Lead time
10.5 d
Value-added time
7,444 s
Process cycle efficiency (PCE)
1.3%
Rolled throughput yield (RTY)
89.8%
Customer demand per day
28 parts
Line capacity per day
20 parts
Bottleneck
Cross-Lay PUR Glue Vacuum Press

Reading the bottleneck

The bottleneck is "Cross-Lay PUR Glue Vacuum Press": it can process 20 parts per day against a demand of 28 parts, so it falls short of demand by 28.0%. Once downtime and scrap are counted, its cycle time grows from 2,083 s to 2,588 s, against a takt of 1,929 s. The largest loss at this step is equipment downtime (uptime 84%), about 397 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.