ENplus-A1 White Wood Biofuel Heating Pellets

Product family: 15kg Retail & Bulk Blown.

Flow: Clean Sawmill Shavings → Belt Dryer Exhaust Heat Recov → Hammermill Uniform 3mm Dust → Ring-Die Extrusion Pellet Mill → Counterflow Cool & Fine Sieve → 15kg Form-Fill-Seal & Big-Bag → District Heat & Residential

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: ENplus-A1 White Wood Biofuel Heating PelletsSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Clean Sawmill Shavings → Belt Dryer Exhaust Heat Recov (191 s) → Hammermill Uniform 3mm Dust (237 s) → Ring-Die Extrusion Pellet Mill (312 s) → Counterflow Cool & Fine Sieve (214 s) → 15kg Form-Fill-Seal & Big-Bag (162 s) → District Heat & Residential.SUPPLIERClean SawmillShavingsI1.80 d1Belt DryerExhaust Heat…C/T 191 sI1.60 d2HammermillUniform 3mm DustC/T 237 sI2.80 d3Ring-DieExtrusion Pellet…C/T 312 sI1.20 d4Counterflow Cool& Fine SieveC/T 214 sI1.00 d515kgForm-Fill-Seal &…C/T 162 sI2.00 dCUSTOMERDistrict Heat &Residential280 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Belt Dryer Exhaust Heat Recov191 s20 min94%98.4%420504 (1.80 d)388
2. Hammermill Uniform 3mm Dust237 s25 min91%97.6%280448 (1.60 d)298
3. Ring-Die Extrusion Pellet Mill312 s45 min84%95.8%420784 (2.80 d)204
4. Counterflow Cool & Fine Sieve214 s20 min93%98.2%140336 (1.20 d)335
5. 15kg Form-Fill-Seal & Big-Bag162 s8 min97%99.4%112280 (1.00 d)475

Key figures

Takt time
289 s
Lead time
10.4 d
Value-added time
1,116 s
Process cycle efficiency (PCE)
0.13%
Rolled throughput yield (RTY)
89.8%
Customer demand per day
280 tonnes
Line capacity per day
204 tonnes
Bottleneck
Ring-Die Extrusion Pellet Mill

Reading the bottleneck

The bottleneck is "Ring-Die Extrusion Pellet Mill": it can process 204 tonnes per day against a demand of 280 tonnes, so it falls short of demand by 27.0%. Once downtime and scrap are counted, its cycle time grows from 312 s to 388 s, against a takt of 289 s. The largest loss at this step is equipment downtime (uptime 84%), about 59.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Sawmills, Timber, CLT & Wood Panels: Sawmills, Timber, CLT & Wood Panels