225L Bordeaux Toasted French Oak Wine Barrel

Product family: Medium-Toast Stave Cooperage.

Flow: 24-Month Air-Dried Tronçais → Jointer Taper & Chime Bevel → Hoop Raise & Steam/Fire Bend → Precision Controlled Flame Toast → Croze Groove & Laser Hoop Drive → Water Pressure Check & Wrap → Premier Cru Wineries

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 225L Bordeaux Toasted French Oak Wine BarrelSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. 24-Month Air-Dried Tronçais → Jointer Taper & Chime Bevel (127 s) → Hoop Raise & Steam/Fire Bend (158 s) → Precision Controlled Flame Toast (208 s) → Croze Groove & Laser Hoop Drive (143 s) → Water Pressure Check & Wrap (108 s) → Premier Cru Wineries.SUPPLIER24-MonthAir-DriedTronçaisI1.80 d1Jointer Taper &Chime BevelC/T 127 sI1.60 d2Hoop Raise &Steam/Fire BendC/T 158 sI2.80 d3PrecisionControlled Flame…C/T 208 sI1.20 d4Croze Groove &Laser Hoop DriveC/T 143 sI1.00 d5Water PressureCheck & WrapC/T 108 sI2.00 dCUSTOMERPremier CruWineries140 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Jointer Taper & Chime Bevel127 s20 min94%98.4%210252 (1.80 d)191
2. Hoop Raise & Steam/Fire Bend158 s25 min91%97.6%140224 (1.60 d)143
3. Precision Controlled Flame Toast208 s45 min84%95.8%210392 (2.80 d)97
4. Croze Groove & Laser Hoop Drive143 s20 min93%98.2%70168 (1.20 d)157
5. Water Pressure Check & Wrap108 s8 min97%99.4%56140 (1.00 d)230

Key figures

Takt time
193 s
Lead time
10.4 d
Value-added time
744 s
Process cycle efficiency (PCE)
0.26%
Rolled throughput yield (RTY)
89.8%
Customer demand per day
140 units
Line capacity per day
97 units
Bottleneck
Precision Controlled Flame Toast

Reading the bottleneck

The bottleneck is "Precision Controlled Flame Toast": it can process 97 units per day against a demand of 140 units, so it falls short of demand by 30.4%. Once downtime and scrap are counted, its cycle time grows from 208 s to 258 s, against a takt of 193 s. The largest loss at this step is equipment downtime (uptime 84%), about 39.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.