Ka-Band LEO Satellite Payload Transponder
Product family: Radiation-Hardened RF Transponders.
Flow: Rad-hard RF supplier → Gold-Plated Fe-Ni-Co Alloy Micro-Mach → Chip-and-Wire Cleanroom → Laser Hermetic Lid Seal → 14-Day Thermal Vacuum Bake → PIM Intermod & Phase Noise → Spacecraft Integration Bay
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Gold-Plated Fe-Ni-Co Alloy Micro-Mach | 1,215 s | 35 min | 94% | 98.2% | 13 | 24 (1.50 d) | 19 |
| 2. Chip-and-Wire Cleanroom | 1,384 s | 15 min | 92% | 96.8% | 8 | 26 (1.63 d) | 16 |
| 3. Laser Hermetic Lid Seal | 1,823 s | 45 min | 85% | 93.8% | 16 | 38 (2.38 d) | 11 |
| 4. 14-Day Thermal Vacuum Bake | 1,181 s | 20 min | 95% | 98.5% | 6 | 18 (1.13 d) | 19 |
| 5. PIM Intermod & Phase Noise | 1,080 s | 12 min | 96% | 99.1% | 4 | 14 (0.88 d) | 21 |
Key figures
- Takt time
- 1,688 s
- Lead time
- 9.25 d
- Value-added time
- 6,683 s
- Process cycle efficiency (PCE)
- 2.7%
- Rolled throughput yield (RTY)
- 87.0%
- Customer demand per day
- 16 units
- Line capacity per day
- 11 units
- Bottleneck
- Laser Hermetic Lid Seal
Reading the bottleneck
The bottleneck is "Laser Hermetic Lid Seal": it can process 11 units per day against a demand of 16 units, so it falls short of demand by 33.6%. Once downtime and scrap are counted, its cycle time grows from 1,823 s to 2,286 s, against a takt of 1,688 s. The largest loss at this step is equipment downtime (uptime 85%), about 322 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Avionics, Space & Flight Electronics: Avionics, Space & Flight Electronics
- Triple-Redundant Flight Control Computer
- Ring-Laser Gyroscope Inertial Reference IRU
- AESA Airborne Phased-Array Radar Antenna
- 15-Inch Synthetic Vision Cockpit LCD/OLED
- Dual-Channel FADEC Engine Control ECU
- Full-Fuselage PTFE Aerospace Cable Harness
- Crash-Survivable Flight Data & CVR Recorder
- Smart Heated Pitot-Static Air Data Probe
- Bipolar Full-Spectrum Mood Cabin Lighting
- 5G-Immune Radar Altimeter LRUs
- Encrypted Beyond-Line-of-Sight UAV Modem