Encrypted Beyond-Line-of-Sight UAV Modem
Product family: Tactical Mesh Radio Links.
Flow: High-end FPGA supplier → 14-Layer Blind Via SMT → CNC Milled RF Shielding Lid → AES Crypto Key Provision → Thermal Cycling -40/+85°C → Over-The-Air Link Margin ATE → Tactical Drone OEMs
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. 14-Layer Blind Via SMT | 324 s | 35 min | 94% | 98.2% | 48 | 90 (1.50 d) | 69 |
| 2. CNC Milled RF Shielding Lid | 369 s | 15 min | 92% | 96.8% | 30 | 96 (1.60 d) | 61 |
| 3. AES Crypto Key Provision | 486 s | 45 min | 85% | 93.8% | 60 | 144 (2.40 d) | 40 |
| 4. Thermal Cycling -40/+85°C | 315 s | 20 min | 95% | 98.5% | 24 | 66 (1.10 d) | 71 |
| 5. Over-The-Air Link Margin ATE | 288 s | 12 min | 96% | 99.1% | 15 | 54 (0.90 d) | 80 |
Key figures
- Takt time
- 450 s
- Lead time
- 9.07 d
- Value-added time
- 1,782 s
- Process cycle efficiency (PCE)
- 0.73%
- Rolled throughput yield (RTY)
- 87.0%
- Customer demand per day
- 60 units
- Line capacity per day
- 40 units
- Bottleneck
- AES Crypto Key Provision
Reading the bottleneck
The bottleneck is "AES Crypto Key Provision": it can process 40 units per day against a demand of 60 units, so it falls short of demand by 33.6%. Once downtime and scrap are counted, its cycle time grows from 486 s to 610 s, against a takt of 450 s. The largest loss at this step is equipment downtime (uptime 85%), about 85.8 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Avionics, Space & Flight Electronics: Avionics, Space & Flight Electronics
- Triple-Redundant Flight Control Computer
- Ring-Laser Gyroscope Inertial Reference IRU
- AESA Airborne Phased-Array Radar Antenna
- 15-Inch Synthetic Vision Cockpit LCD/OLED
- Dual-Channel FADEC Engine Control ECU
- Full-Fuselage PTFE Aerospace Cable Harness
- Ka-Band LEO Satellite Payload Transponder
- Crash-Survivable Flight Data & CVR Recorder
- Smart Heated Pitot-Static Air Data Probe
- Bipolar Full-Spectrum Mood Cabin Lighting
- 5G-Immune Radar Altimeter LRUs